My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227B.1
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:01:00 PM
Creation date
10/1/2015 5:04:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/18/2012
Control Number
2012-227B.1
Agenda Item Number
8.V.
Entity Name
Barth Construction, Inc.
Subject
Addendum No. 1, 2, 3
South County Regional Park
Area
Multi-Purpose Field
Bid Number
2013009
Supplemental fields
SmeadsoftID
11697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until ffinal acceptance , whichever is latest) . <br /> K . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project. Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily . <br /> Replanting or repair necessary due to the Contractor's negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6" without mowing (2" on <br /> fields) . Clippings shall be removed . <br /> L . Article 570-9 . The first two paragraphs under this Article are deleted and the <br /> following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer (2 <br /> applications) , mowing , sweeping as needed after mowing , pegging disposal of <br /> clippings , water, tools , equipment, labor and all other incidentals necessary . <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No . 30 — Performance Turf (Sod ) (Argentine Bahia) — Per Square Yard <br /> Bid Item No . 31 — Performance Turf ( Big Roll Sod ) (419 Hybrid Bermuda) ( For <br /> Multi-Purpose Fields) — Per Square Yard <br /> SECTION — 27 — LANDSCAPING <br /> The work specified in this item shall conform to Section 580 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010) . <br /> Payment shall be made under: <br /> Bid Item No . 32 — Slash Pine ( 1 " CAL . , 6-6' High ) - Per Each <br /> Bid Item No . 33 — Southern Live Oak (3" CAL . , 12 ' -14' High ) — Per Each <br /> Bid Item No . 34 — Sabal Palmetto ( 16' C . T. , Heavy Booted , 6 Frond Min . ) Per Each <br /> Bid Item No . 35 — Saw Palmetto (3 GAL . , 14"x14") Per Each <br /> SECTION — 37 - SIGNING AND PAVEMENT MARKINGS <br /> A . Signing and pavement marking for traffic control shall conform to the <br /> requirements of the Standard Specifications (2010) , Manual on Uniform Traffic Control <br /> Devices , Supplemental Specifications , Roadway and . Traffic Design Standards , <br /> manufacturer's specifications . <br /> Item of Payment <br /> Payment shall be made under: <br /> Addendum #2 11 /8/2012 01025-26 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1126 - South Co Park Multi Purpose Fields\Admim\bid documents\Contract <br /> Documents\Technical Specifications ADD #2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.