My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-159
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 9:25:39 AM
Creation date
10/1/2015 5:31:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/20/2013
Control Number
2013-159
Agenda Item Number
8.QQ.
Entity Name
Borrelli & Partners
Subject
South County Regional Park Intergenerational Agreement
Amendment No.1
Area
South County Regional Park
Project Number
1135
Supplemental fields
SmeadsoftID
12160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
619 <br /> BORRELLI + PARTNERS <br /> ARCNiTECTURE PLANNING LANDSCAPE iNTEPIORS <br /> August 7r", 2013 <br /> Mr. Christopher J . Kafer, Jr. , P. E. <br /> County Engineer <br /> Engineering Division <br /> 1801 271 ' Street (Building A) <br /> Vero Beach, FL 32960 <br /> Re: Revised Fee Proposal for Additional Services for the Indian River County Intergenerational Recreation Facility at <br /> South County Regional Park, Vero Beach, Florida <br /> Dear Mr. Kafer: <br /> Borrelli + Partners, Inc. (B+P) respectfully submit this revised additional services fee proposal for the above referenced <br /> project for your review and consideration . <br /> The project' s increased scope, as we understand it, is described below: <br /> B+P have reached a previous Agreement with Indian River County (IRC) to provide Architectural, Engineering, Landscape <br /> & Irrigation Design, Surveying and Cost Estimating Services to IRC for a two phase, approximately 40,000 sq .ft. <br /> Intergenerational Recreation Facility at South County Regional Park in Vero Beach, FL. B+P are under contract to <br /> develop construction documents for phase 1 only of the Intergenerational Recreation Facility, at approximately 22 ,000 <br /> sq .ft. with an established construction budget not exceeding $4,400,000. Based on the approved program and preliminary <br /> design document, IRC has elected to increase the scope of the project and our services through an increase to the project' s <br /> construction budget. The new project budget is estimated not to exceed $ 7,276,000. This is based on the original <br /> estimation of construction costs of approximately $200.00 per sq.ft. The approved program for phase one is now <br /> approximately 36,380 sq .ft. <br /> The building's increase is due to IRC's decision to add the phase 2 Activity Room (AA.08) into phase 1 . In addition, based <br /> on previously increased sizes for the Multi-Activity Rooms and the Multi-Purpose Rooms, we had to increase the toilet <br /> counts in phase 1 to meet code. (See attached Version 5 of the program summary) . It is our understanding that IRC <br /> directed B+P to include two (2) Assisted Restroom/Shower/Changing Room (PS.08) into phase 1 as well . <br /> A/E COMPENSATION: <br /> The following proposed compensation for architectural and engineering scope of services increase is consistent with the <br /> method we implemented to arrive at our currently approved fees for this project: <br /> The original phase one project budget was $4,400,000.00. The project's budget and scope is being increased to <br /> approximately to $ 7,276,000.00, an addition of approximately $ 2, 876,000.00 to the construction budget. B+P's original <br /> Basic Services fees are $ 366, 146.52, which equates to the approved 8. 32% fee. Therefore, B+P are seeking additional <br /> compensation for the increase in services triggered by the increase in the construction budget. We respectfully request a fee <br /> adjustment of an additional Two Hundred Thirty Nine Thousand Two Hundred Eighty Three Dollars ($239,283 .00) to the <br /> total Basic Services fees. This is based on the previously approved 8. 32% fee on the new project budget of $ 2, 876,000.00. <br /> F <br /> JAIME E . BORRELLI , AIA , NCARB : : JORGE A . BORRELLI , ASLA : : JIM BORRELLI , CGC : : JUDY A . CARTY, <br /> AIA , NCARB <br /> 0. -107.418. 1338 :: �iis 407.418. 1342 <br /> 720 Vassar Street , Orlando, Florida 3280.1 <br /> web horrelliarchitects .com <br /> nn ( : 01) 07 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.