My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-054
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:44:48 PM
Creation date
10/1/2015 4:14:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/20/2012
Control Number
2012-054
Agenda Item Number
12.I.2
Entity Name
Borrelli and Partners, Inc.
Subject
South County Regional Park Intergenerational Recreation Facility
Area
Oslo Road and 20th Ave.
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IQIPI <br /> BORRELLI + PARTNERS <br /> ANCi , iYEcIUNC VLANNINCv LANp5Cn. PE 1NTFn40JJ6 <br /> March 13`h, 2012 <br /> Mr. Christopher ) . Kafer, Jr., P. E. <br /> County Engineer <br /> Engineering Division <br /> 1801 271h Street ( Building A) <br /> Vero Beach, FL 32960 <br /> Re: REVISED - Scope and Fee Proposal for Architectural and Engineering Design Services for the Indian River County <br /> Intergenerational Recreation Facility at South County Regional Park, Vero Beach, Florida <br /> Dear Mr. Kafer: <br /> Pursuant to your request, Borrelli + Partners, Inc. (B + P) are pleased to provide this scope and fee proposal for the <br />above <br /> referenced project for your review and consideration . <br /> rhe project's scope, as we understand it, is described below: <br /> Develop Architectural and Engineering design and contract documents for a two phase, approximately <br /> 40, 000 sq . ft. Intergenerational Recreation Facility at South County Regional Park in Vero Beach , FL . It is <br /> also our understanding that the project budget for this project is $ 5 , 500, 000 . 00 for Phase One <br /> development and that the construction budget for Phase One development is approximately <br /> $ 4, 400, 000 . 00. Our proposal is primarily based on information noted in RFQ 4 2012024 and our <br /> scoping meeting on 03 . 04 . 12 . <br /> It is understood the project will be developed in at least two (2) construction phases with programming, <br /> master planning and schematic design for the both phases being completed which would include up to a <br /> 40, 000 sq . ft. building and construction documents completed for Phase One only. The exception is Civil <br /> Engineering services, which will be completed for both Phases One and Two during Phase One <br /> development. The project generally consists of the following: <br /> Phase One: -20, 000 — 40, 000 sq .ft. Intergenerational Recreation Facility <br /> -Vehicular access to proposed 600 parking space improvements from Oslo Road (9' <br /> Street SW) <br /> - Pedestrian connection to existing park <br /> -Stormwater management system design for primary site and parking <br /> -Stormwater management system design for treatment and attenuation for the County' s <br /> proposed four (4) Lacrosse fields. ( Design of Lacrosse fields are not in scope) <br /> Phase Two: -20, 000 25, 000 sq . ft. Intergenerational Recreation Facility expansion <br /> Specific program elements are defined in RFQ # 2012024 are to be considered for the development of <br /> this project and is the basis for which the team has developed our scope and fee proposals . <br /> JAIME E . BORRELLI , AIA , NCARS : : JORGE A . SORRELLI , ASLA : : JIM SORRELLF , CGC : : JUDY A . CARTY , AIA <br />, NCARH <br /> hd. #R7.-41fi. 1 ; 3h : ; (r.r -Nl"' . 415 . 1341 <br /> :?U ti',lisr Slrect, i )t1.uaJu. F1m ida 329111 <br /> nxd+ Ittn' relliarcllilsul ;:. rrml <br /> :1AC m) iP l I <br />
The URL can be used to link to this page
Your browser does not support the video tag.