Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES , INC. <br /> 66th Avenue Bridge over 41 st Street <br /> September 24, 2012 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT *A7 <br /> CHIEF SENIOR FIELD TOTAL LABOR <br /> ENGINEER ENGINEER REP HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $150.00 $115.00 $70.00 <br /> Pre Construction Meeting1 .0 1 .0 2.0 $265.00 <br /> Sho Drawin Reviews 8.0 16.0 24.0 $3,040.00 <br /> Pile Castro 2.0 8.0 10.o $790.00 <br /> Pile Driving 8.0 40.0 48.0 $3,720.00 <br /> Pile Cas 18.0 48.0 66.0 $5,430.00 <br /> Reinforcing steel superstructure 8.0 8.0 16.0 $1 ,480.00 <br /> D run with concrete screed 8.0 8.0 16.0 $1 ,480.00 <br /> Castro of the deck stab B.0 10.0 18.0 $1 ,620.00 <br /> Sidewalk 16.0 16.0 $1 , 120.00 <br /> Barriers 16.0 16.0 $13120.00 <br /> Aoproach Slabs &0 &0 $560.00 <br /> Approach Slab Sidewalk 6.0 8.0 $560.00 <br /> Approach Slab Barrier 8.0 8.0 $560.00 <br /> Final Inspection 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification 8.0 8.0 $13200.00 <br /> Load Rating I Aswbuitts 4.4 a.4 3.0 15.0 $1 ,730.00 <br /> TOTAL MANHOURS 25.0 77.0 - 185.0 287.0 <br /> DIRECT LABOR COST $36750.00 $8,855.00 $12,950.00 $251555.00 <br /> $25,555.00 <br /> PDA TESTING (3) $8.650.00 <br /> TOTAL FEES $34,205.00 <br /> S:12005-JobsMm619 Vero Bridges%CorrespondenceWxhibit A 09-24-12.xis <br />