Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC . <br /> 66th Avenue Bridge over 45th Street <br /> September 24, 2012 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "B" <br /> CHIEF SENIOR FIELD TOTAL LABOR <br /> ENGINEER ENGINEER REP HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $150.00 $115.00 $70.00 <br /> Pre-Construction Meeting 1 .o 1 .o 2.0 $265.00 <br /> Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 <br /> Pile Casting 2.0 8.0 10.0 $790.00 <br /> Pile Driving 8.0 40.0 48.0 $3,720.00 <br /> Pile Caps 8.0 32.0 40.0 $3, 160.00 <br /> Pre-stressed decks - casting 8.0 16.0 1 24.0 $2,040.00 <br /> Pre-stressed decks - placement 4.0 4.0 $280.00 <br /> Closure Pours 8.0 8.0 $560.00 <br /> Post Tensioning 8.0 8.0 $920.00 <br /> End Closure Pours 8.0 8.0 $560.00 <br /> Sidewalks 16.0 16.0 $1120.00 <br /> Barriers 16.0 16.0 $1, 120.00 <br /> Approach Slabs 8.0 8.0 $560.00 <br /> Approach Slab Sidewalk 8.0 8.0 $560.00 <br /> Approach Slab Barrier 8.0 8.0 $560.00 <br /> Final tns 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification ko 8.0 $1200.00 <br /> Load Rating / As-builts 4.0 8.0 3.0 15.0 $1 ,730.00 <br /> TOTAL MANHOURS 25.0 59.0 179.0 263.0 <br /> DIRECT LABOR COST $3,750.00 $61785.00 $12,530.00 $23,065.00 <br /> $23,065.00 <br /> PDA TESTING (1 ) $2.950.00 <br /> TOTAL FEES $26,015.00 <br /> 8:\2005-Jobs\05.619 Vero Bridges\Correspondence\Fxhibit B 09-24-12.xls <br />