My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-201
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:14:43 AM
Creation date
10/1/2015 4:45:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/06/2012
Control Number
2012-201
Agenda Item Number
8.N.
Entity Name
Bridge Design Associates
Subject
Work Order No. 2
66th Ave. Bridge Replacements
Area
66th Ave. Bridge over 41st. St.
Supplemental fields
SmeadsoftID
11540
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC . <br /> 66th Avenue Bridge over 45th Street <br /> September 24, 2012 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "B" <br /> CHIEF SENIOR FIELD TOTAL LABOR <br /> ENGINEER ENGINEER REP HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $150.00 $115.00 $70.00 <br /> Pre-Construction Meeting 1 .o 1 .o 2.0 $265.00 <br /> Shop Drawing Reviews 8.0 16.0 24.0 $3,040.00 <br /> Pile Casting 2.0 8.0 10.0 $790.00 <br /> Pile Driving 8.0 40.0 48.0 $3,720.00 <br /> Pile Caps 8.0 32.0 40.0 $3, 160.00 <br /> Pre-stressed decks - casting 8.0 16.0 1 24.0 $2,040.00 <br /> Pre-stressed decks - placement 4.0 4.0 $280.00 <br /> Closure Pours 8.0 8.0 $560.00 <br /> Post Tensioning 8.0 8.0 $920.00 <br /> End Closure Pours 8.0 8.0 $560.00 <br /> Sidewalks 16.0 16.0 $1120.00 <br /> Barriers 16.0 16.0 $1, 120.00 <br /> Approach Slabs 8.0 8.0 $560.00 <br /> Approach Slab Sidewalk 8.0 8.0 $560.00 <br /> Approach Slab Barrier 8.0 8.0 $560.00 <br /> Final tns 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification ko 8.0 $1200.00 <br /> Load Rating / As-builts 4.0 8.0 3.0 15.0 $1 ,730.00 <br /> TOTAL MANHOURS 25.0 59.0 179.0 263.0 <br /> DIRECT LABOR COST $3,750.00 $61785.00 $12,530.00 $23,065.00 <br /> $23,065.00 <br /> PDA TESTING (1 ) $2.950.00 <br /> TOTAL FEES $26,015.00 <br /> 8:\2005-Jobs\05.619 Vero Bridges\Correspondence\Fxhibit B 09-24-12.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.