Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. <br /> 13TH STREET AND 58TH AVENUE BRIDGE REPLACEMENT <br /> November 20, 2013 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT W <br /> PROJECT PROJECT FIELD CAD 118y <br /> LABOR <br /> MANAGER ENGINEER REP TECH COST <br /> ACTIVITY SHE EJ. BY <br /> * AACTIVITY <br /> $150.00 $115.00 $70.00 $90.00 <br /> COORDINATION Nil <br /> Utility Coodination WA 4.0 a.o e.o $1 ,oeo.00 <br /> Pennit Meetings / IRFWCD / SJRWMD I ACOE / DE N/A 4.0 4.0 5600.00 <br /> DESIGN <br /> General Notes/ Construction Notes / Specifications N/A 2.5 8.0 10.5 $1 ,295.00 <br /> Design Sheet pile wall system for end bent WA e.o 8.0 $690.00 <br /> Design end bent pille cap NIA 6.0 6.0 $690.00 <br /> Design su ersbWure deck slab WA 2.0 12.0 14.0 $1 ,e80.00 <br /> Design closure pours NIA 3.0 3.0 $345.00 <br /> Design post tension system WA 4.0 4.0 $450.00 <br /> Design barrier system & guardrail WA 2.0 4.0 8.0 $780.00 <br /> Design slope n NIA 2.0 4.0 e.o $750.00 <br /> PLANS PREPARATION <br /> Index of Sheets / Location Ma I Summ of Q B1 6.0 a.o $540.00 <br /> Bridge Cross section existing & prop 02 4.0 4.0 $360.00 <br /> General Notes / Design Criteria / Constr. Notes B3 2.0 20 $180.00 <br /> Bridge Plan Sheet B4 12.0 12.0 $19080.00 <br /> Bridge Elevation B5 3.0 3.0 $270.00 <br /> Substructure Plan B6 e.o 6.0 $540.00 <br /> Pile Data Table i Soil Borings B7 e.0 6.0 $640.00 <br /> Finish Grade Plan B8 12.o 12.0 $10080.00 <br /> End Bent Plan & Elevation B9 e.o 6.0 $540.00 <br /> End Bent details B10 q4oO24,0 <br /> 12.0 $11080.00 <br /> Su tructlue typical cross section B11 $380.00 <br /> Precast slab la ut Ian & t tension B12 0 $360.00 <br /> Precast slab lan elevation 813 0 $720.00 <br /> Precast slab details, bar bendin d B14 .0 $1 ,520.00 <br /> Sheet pile wall details, notes etc. 815 8.0 B.o $720.00 <br /> Approach slab la out sheet B16 a.0 6.0 $540.00 <br /> Index sheets (6001601 ,614,700-1 ,7004, 810 617- <br /> 8201 - 8204) B24 9.o 9.0 $810.00 <br /> Load Ratio Analysis WA 5.0 18.0 21 .0 $1 ,895.00 <br /> MISCELLANEOUS <br /> Quantities & Estimates NIA 1 .0 2.0 120 15.0 $1 ,220.00 <br /> Permit Application & Responses WA 4.0 8.0 5.0 17.0 $1 ,970.00 <br /> TOTALMANHOURS 21 .5 68.0 28.0 131 .0 248.5 <br /> DIRECT LABOR COST $3,225.00 $7,590.00 $11950.00 $11 ,790.00 $24,585.00 <br /> ENGINEERING FEES $24,555.00 <br /> S;120054obsW6-52413th St SW over 581h Ave BrWoeWl AdmjnW apwalsWAW A Dssipn 11404 36"bit A Deaipn 1140.13 <br />