My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-249
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:31:24 AM
Creation date
10/1/2015 5:49:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/10/2013
Control Number
2013-249
Agenda Item Number
8.B.
Entity Name
Bridge Design Associates
Subject
Work Order No. 3 !3th Street SW Bridge
Area
13th St.SW Bridge over IRFWCD Sub-Lateral B-8 Canal 58th Ave.
Supplemental fields
SmeadsoftID
12697
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES , INC. <br /> 13TH STREET OVER SUB LATERAL B-8 CANAL <br /> CONSTRUCTION PHASE <br /> November 20, 2013 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "B" <br /> PROJECT PROJECT FIELD REP CAD TOTAL LABOR <br /> MANAGER ENGINEER EJ. TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $ 150.00 $115.00 $70.00 $90.00 <br /> Pre Construction Meeting 2.0 2.0 4.0 $530.00 <br /> Shop Drawing Reviews 8.0 16.0 24.0 $3040.00 <br /> Pile Casting 2.0 8.0 1 10.0 $790.00 <br /> Pile Ddvi 16.0 40.0 56.0 54,640.00 <br /> Pile Cas 8.0 32.0 40.0 53160.00 <br /> Prestressed Decks - Casting 8.0 16.0 24.0 $2,040.00 <br /> PreSMessed Decks - Placement 8.0 8.0 $560.00 <br /> Closure Pours 8.0 8.0 $560.00 <br /> Post Tensioning 8.0 8.0 $920.00 <br /> End Closure Pours 8.0 8.0 $560.00 <br /> Sidewalks 16.0 16.0 $1 .120.00 <br /> Barriers 16.0 16.0 1 $1 ,120.00 <br /> Approach Slabs 8.0 8.0 $560.00 <br /> Approach Slabs Sidewalk 8.0 8.0 $560.00 <br /> Approach Slab Barrier &0 8.0 $560.00 <br /> Final Inspection 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification 8.0 8.0 51,200.00 <br /> TOTAL MANHOURS 22.0 60.0 180.0 0.0 262.0 <br /> DIRECT LABOR COST $3.300.00 $6.900.00 51200.00 $0.00 $22,800.00 <br /> $22,800.00 <br /> PDA TEST (2) 56.300.00 <br /> TOTAL $29,100.00 <br /> SA2006sJobs10"24 13th St SW over 58th Ave Brldge101 AdminWroponaIMEA t B CPS <br />
The URL can be used to link to this page
Your browser does not support the video tag.