Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES , INC. <br /> 13TH STREET OVER SUB LATERAL B-8 CANAL <br /> CONSTRUCTION PHASE <br /> November 20, 2013 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "B" <br /> PROJECT PROJECT FIELD REP CAD TOTAL LABOR <br /> MANAGER ENGINEER EJ. TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $ 150.00 $115.00 $70.00 $90.00 <br /> Pre Construction Meeting 2.0 2.0 4.0 $530.00 <br /> Shop Drawing Reviews 8.0 16.0 24.0 $3040.00 <br /> Pile Casting 2.0 8.0 1 10.0 $790.00 <br /> Pile Ddvi 16.0 40.0 56.0 54,640.00 <br /> Pile Cas 8.0 32.0 40.0 53160.00 <br /> Prestressed Decks - Casting 8.0 16.0 24.0 $2,040.00 <br /> PreSMessed Decks - Placement 8.0 8.0 $560.00 <br /> Closure Pours 8.0 8.0 $560.00 <br /> Post Tensioning 8.0 8.0 $920.00 <br /> End Closure Pours 8.0 8.0 $560.00 <br /> Sidewalks 16.0 16.0 $1 .120.00 <br /> Barriers 16.0 16.0 1 $1 ,120.00 <br /> Approach Slabs 8.0 8.0 $560.00 <br /> Approach Slabs Sidewalk 8.0 8.0 $560.00 <br /> Approach Slab Barrier &0 8.0 $560.00 <br /> Final Inspection 4.0 4.0 8.0 $880.00 <br /> Final Report & Certification 8.0 8.0 51,200.00 <br /> TOTAL MANHOURS 22.0 60.0 180.0 0.0 262.0 <br /> DIRECT LABOR COST $3.300.00 $6.900.00 51200.00 $0.00 $22,800.00 <br /> $22,800.00 <br /> PDA TEST (2) 56.300.00 <br /> TOTAL $29,100.00 <br /> SA2006sJobs10"24 13th St SW over 58th Ave Brldge101 AdminWroponaIMEA t B CPS <br />