Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. a <br /> 82ND AVENUE AND 4TH STREET BRIDGE REPLACEMENT OVER LATERAL D CANAL Q <br /> DESIGN PHASE REVISED <br /> April 7, 2010 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "K <br /> CHIEF SENIOR ENGINEER CAD TOTAL LABOR <br /> ENGINEER ENGINEER INTERN TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> ACTIVITY ACTIVITY <br /> $145.00 $115.00 560.00 58000 <br /> Coordinate Soils Testing 4.0 4.0 $580.00 <br /> Utility Coordination 4.0 8.0 120 $1 ,500.00 <br /> Bridge Layout to Site Conditions 4.0 16.0 8.0 28.0 $2060.00 <br /> Foundation Design 4.0 16.0 40.0 60.0 $5,620.00 <br /> Pile Cap Design & Detailing 4.0 16.0 40.0 60.0 $5,620.00 <br /> Slab Design & Detailing 4.0 16,0 40.0 60.0 $6,620.00 <br /> Barrier Design & Detailing 4.0 16.0 8.0 280 53,060.00 <br /> Design Notes & SpGcifications 4.0 16.0 20.0 $2,420.00 <br /> Design Calculations 4.0 24.0 24.0 52.0 $4,780.00 <br /> Quantifies 20 30.0 120 44.0 $3,050.00 <br /> Cost Estimate & Rebar Details 2.0 8.0 10.0 $1 ,210.00 <br /> Permitting 2.0 40.0 42.0 $4,890.00 <br /> IRC Reviews 50% 90%, 100% 4.0 16.0 8,0 28.0 $3,060.00 <br /> Phasing Details 4.0 16.0 16.0 36.0 $3,700.00 <br /> Load Rating Analysis 5.0 16.0 21 .0 51 ,535,00 <br /> TOTAL MANHOURS 46.0 201 .0 86.0 1720 505.0 <br /> DIRECT LABOR COST $60670.00 323,115.00 $5,160.00 $136760.00 5481705.00 <br /> 548,705.00 <br /> S:\2010Jobs1Prcposals182nd over lateral D1CorrespondencelExhibitA Design 04-07-10 <br />