Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. , <br /> 82ND AVENUE AND 4TH STREET BRIDGE REPLACEMENT OVER LATERAL D CANAL Q <br /> CONSTRUCTION PHASE <br /> April 7a 2010 <br /> HOURLY BREAMOWN OF SERVICES <br /> E) HIBIT 'B' <br /> CHIEF SENi9R ENSINEER CHID TOTAL LABOR <br /> EI MEER B38OMM IUTERN TECHNICIAN HOURS COST <br /> ACTIVITY BY BY <br /> A4:Tnmv AaTnnrY <br /> $145.00 $115.00 :"$Waco $80.00 <br /> Pre Construction Moofing 20 20 4.0 $520.00 <br /> Shop Drawing Revkrms &0 16.0 24.0 $3,000.00 <br /> Pile Casong 20 &0 10.0 $710.00 <br /> Pile Driving 16.0 80.0 96.0 $6,640.00 <br /> Pilecaps 16.0 64.0 80.0 $5,680.00 <br /> Pr"bessed Deft - CwAng &a 162 24.0 $10880.00 <br /> Pre-Sbvssed Decks - Plaeemerd 8.0 E.0 $480.00 <br /> Closure Pours 8.0 8.0 $480.00 <br /> Post Terlsimi 8.0 &0 5820.00 <br /> End Closure Pours 8.0 &0 $480.00 <br /> Sidewalks 16.0 16.0 $.980.00 <br /> Barriers 16.0 16.0 $960.00 <br /> A h Stabs 8.0 &o $480.00 <br /> Approach Slabs Sidewalk 8.0 &0 $460.00 <br /> Approach Slab Barrier 8.0 8.0 $480,00 <br /> Final Inspection 4.0 4.0 8.0 $820.00 <br /> Final Report & CerOflraHorâ–º 8.0 &0 $11160.00 <br /> TOTAL MAN - OURS 22.0 88.0 252.0 0.0 342.0 <br /> DIRECT LABOR COST $3,190.00 57,820.00 $15,120.00 $0.00 $26, 130.00 <br /> $26, 130.00 <br /> PDA TEST (2) $6.300.00 <br /> TOTAL $32,430.00 <br /> 8:12010-Jobs%Proposals182nd over lateral MorrespondenoelExhibft 6 CPS <br />