Laserfiche WebLink
CDM will estimate the annual emission rates of non-methane organic compounds and volatile <br /> organic compounds from the landfill gas to determine the IRC Landfill' s status with regard to <br /> operation and reporting requirements of the active landfill gas collection and control system <br /> under the New Source Performance Standards requirements . <br /> Annual Emissions Fee <br /> CDM will submit the annual emissions fee to FDEP between January 15 and March 1 using <br /> completed FDEP Form 62-213 . 900(1 ) . IRC SWDD is responsible for providing CDM with the <br /> required fee . <br /> Visible Emissions Testing <br /> CDM will contract with a certified observer to perform the annual visible emissions test in order <br /> to determine the opacity of the flare . CDM will provide oversight of the annual visible emission <br /> testing of the flare, notify FDEP of the time and location of the test, and prepare and submit to <br /> FDEP a report of the test results . <br /> TASK 4 . 0 - GENERAL TECHNICAL AND MISCELLANEOUS PERMIT COMPLIANCE <br /> ASSISTANCE <br /> CDM will provide general technical and permit compliance assistance to IRC SWDD staff on an <br /> as needed basis . IRC SWDD staff is performing a number of the tasks required annually by the <br /> current FDEP landfill permits . CDM will provide support as needed for the SWDD staff as they <br /> perform these tasks . <br /> Each task will be authorized and documented up to the budgeted amount for each task . General <br /> technical and permit compliance assistance tasks may include : <br /> ■ reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br /> ■ quarterly monitoring and reporting of the landfill gas monitoring wells located at the IRC <br /> Landfill site boundary, as well as enclosed structures located on site; <br /> ■ submittal of records of groundwater dewatering volumes to St. Johns River Water <br /> Management District in compliance with the consumptive use water permit; <br /> ■ preparing agenda items for and attend IRC Board of County Commissioners meetings, <br /> ■ developing annual IRC SWDD budgets, and <br /> ■ miscellaneous permit renewals or technical support <br /> PROTECT SCHEDULE <br /> The following project schedule has been developed based on authorization to provide design <br /> services being received on January 1 , 2010 . <br /> Task 1 : January 1 , 2010 through December 31 , 2010 <br /> Task 2: January and July (within 60 days of receipt of laboratory analysis) <br /> A-4 j12565. doc <br />