My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-019
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 4:56:50 PM
Creation date
10/1/2015 1:57:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/12/2010
Control Number
2010-019
Agenda Item Number
15.B.1
Entity Name
Camp Dresser & McKee (CDM) Monitoring and Reporting
Subject
Work Order No.13
Supplemental fields
SmeadsoftID
9545
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM will estimate the annual emission rates of non-methane organic compounds and volatile <br /> organic compounds from the landfill gas to determine the IRC Landfill' s status with regard to <br /> operation and reporting requirements of the active landfill gas collection and control system <br /> under the New Source Performance Standards requirements . <br /> Annual Emissions Fee <br /> CDM will submit the annual emissions fee to FDEP between January 15 and March 1 using <br /> completed FDEP Form 62-213 . 900(1 ) . IRC SWDD is responsible for providing CDM with the <br /> required fee . <br /> Visible Emissions Testing <br /> CDM will contract with a certified observer to perform the annual visible emissions test in order <br /> to determine the opacity of the flare . CDM will provide oversight of the annual visible emission <br /> testing of the flare, notify FDEP of the time and location of the test, and prepare and submit to <br /> FDEP a report of the test results . <br /> TASK 4 . 0 - GENERAL TECHNICAL AND MISCELLANEOUS PERMIT COMPLIANCE <br /> ASSISTANCE <br /> CDM will provide general technical and permit compliance assistance to IRC SWDD staff on an <br /> as needed basis . IRC SWDD staff is performing a number of the tasks required annually by the <br /> current FDEP landfill permits . CDM will provide support as needed for the SWDD staff as they <br /> perform these tasks . <br /> Each task will be authorized and documented up to the budgeted amount for each task . General <br /> technical and permit compliance assistance tasks may include : <br /> ■ reporting required by the Multi -Sector Generic Permit for stormwater discharge; <br /> ■ quarterly monitoring and reporting of the landfill gas monitoring wells located at the IRC <br /> Landfill site boundary, as well as enclosed structures located on site; <br /> ■ submittal of records of groundwater dewatering volumes to St. Johns River Water <br /> Management District in compliance with the consumptive use water permit; <br /> ■ preparing agenda items for and attend IRC Board of County Commissioners meetings, <br /> ■ developing annual IRC SWDD budgets, and <br /> ■ miscellaneous permit renewals or technical support <br /> PROTECT SCHEDULE <br /> The following project schedule has been developed based on authorization to provide design <br /> services being received on January 1 , 2010 . <br /> Task 1 : January 1 , 2010 through December 31 , 2010 <br /> Task 2: January and July (within 60 days of receipt of laboratory analysis) <br /> A-4 j12565. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.