Laserfiche WebLink
per sampling event. In the event that FDEP requires resampling of groundwater monitoring <br />wells, the labor and materials will be invoiced under Task 4 of this Scope of Services. If the <br />resampling is the result from errors made by the sampling staff, IRC will not be invoiced. <br />CDM/ITS will deliver the samples to the ENCO Orlando office for analysis. <br />ENCO will perform the laboratory analysis under IRC SWDD's contract. CDM will assist IRC <br />SWDD in coordinating the analytical testing activities with ENCO, notify FDEP prior to <br />sampling as required by the MPIS, review and evaluate the analytical test results, and prepare <br />the semi-annual reports. <br />CDM will prepare two semi-annual reports that will be submitted to FDEP within 60 days of <br />receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to <br />analyze samples. Services included in preparing the semi-annual reports include: <br />■ Review of laboratory result with respect to FDEP groundwater quality criteria and historical <br />laboratory results. If review of the data indicates potential errors in the results or <br />concentrations of analyses that could potentially result in enforcement action, CDM will <br />notify IRC SWDD prior to preparing the report and request confirmatory samples, if needed. <br />■ Preparation of semi-annual monitoring reports for the January and July monitoring events. <br />The reports will include brief discussions of the results, water level contour maps, and copies <br />of the analytical reports a draft report will be submitted for review, if requested. <br />■ CDM will prepare three copies of the final report for submittal to FDEP and will provide one <br />file copy to IRC SWDD <br />IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other <br />electronic format accepted by FDEP). <br />TASK 3.0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br />Title V Permit No. 0610015 -003 -AV contains monitoring and reporting requirements related to <br />the landfill gas collection and control system. CDM will assist IRC SWDD, as described below, <br />in fulfilling all air permit requirements and conditions within the required regulatory <br />timeframes. <br />Statement of Compliance <br />CDM will prepare and submit the annual Statement of Compliance for the IRC Landfill. This <br />document must be submitted to FDEP within 60 days after the end of the calendar year, as <br />required by Rule 62-213.440(3)(a)(2), F.A.C. <br />Annual Operating Report <br />CDM will prepare and submit the Annual Operating Report for the IRC Landfill. This report <br />must be submitted to FDEP or before March 1 of each calendar year using the annual operating <br />report form for an air pollutant emitting facility, as required by Rule 62-210.370(3), F.A.C. <br />A-3 j12565.doc <br />