Laserfiche WebLink
® Architectural (John H . Dean Architect & Associates) <br /> ® HVAC / Plumbing (John H . Dean Architect & Associates) <br /> ® Landscape (John H . Dean Architect & Associates) <br /> ■ Electrical (Smith Engineering Consultants, Inc.) <br /> A preliminary list of drawings is included at the end of this scope . Drawings for improvements that <br /> will be provided in the permit applications will be completed to 90 percent level . Drawings and <br /> specifications for improvements which will be publicly bid will be completed to 100 percent level . <br /> CDM will submit progress submittals of the Construction Documents at the 30 , 60 , and 90 percent <br /> completion stages . The number of copies of each progress submittal shall be as specified below. <br /> Following each of the progress submittals , CDM will schedule a meeting with IRC SWDD staff to <br /> review the documents and discuss any comments and / or questions . Following this review meeting <br /> and receipt of IRC SWDD staff comments on the progress submittal, CDM shall proceed with design <br /> and preparation of the next progress submittal, addressing IRC SWDD staff comments , and <br /> continuing detailed design development. <br /> The 30 , 60 , and 90 percent submittals shall consist of a set of drawings including a drawing index, <br /> existing site survey, a general site layout drawing, layout plans for each major structure, design <br /> detail development to the respective level , and general construction details . The Contract <br /> Documents submittal shall include draft bidding requirements , contract conditions , contract forms , <br /> and draft technical specifications . Five copies of the 30 , 60 , and 90 percent complete documents <br /> will be submitted to IRC SWDD . No additional survey budget is provided in this amendment. <br /> The 100 percent submittal shall consist of the same materials submitted at the 30 , 60 , and 90 <br /> percent stages , except that the level of detail of the documents shall be completed to the 100 <br /> percent completion level, including permit conditions / requirements . CDM will prepare and deliver <br /> ten copies ( 24 " x 36 ") of the 100 percent design drawings to IRC SWDD . The 100 percent submittal <br /> shall become the Bid Set. <br /> Subtask 1 . 6 - Preparation of Contract Documents <br /> CDM will prepare Contract Documents , utilizing the EJCDC / CSI format, which will consist of <br /> bidding requirements, contract conditions , contract forms, and written technical descriptions of <br /> materials , equipment, construction systems , standards and workmanship as applied to this project. <br /> The level of detail and information to be included in the Contract Documents shall be sufficient to <br /> allow competitive bidding of the project from qualified general contractors, and consistent with <br /> generally accepted standards of the engineering and construction industry. <br /> Subask 1 . 7 - Preparation of Construction Cost Estimate <br /> CDM will prepare an estimate of probable construction cost for work to be performed by a general <br /> contractor. A cost estimate will be prepared at the 60 percent design level and at the 100 percent <br /> design level . <br /> TASK 2 . 0 - PERMITTING ASSISTANCE <br /> This task consists of the preparation by CDM of necessary permit modification applications to the <br /> various regulatory agencies having jurisdiction over this project. CDM will prepare the following <br /> permit modification applications : <br /> A- 4 j13215_Revised .doc <br />