My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-100
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 11:36:45 AM
Creation date
10/1/2015 2:10:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/20/2010
Control Number
2010-100
Agenda Item Number
12.J.2.
Entity Name
Camp Dresser & McKee Work Order #13
Subject
Well No.7 South County R.O. Water Treatment
Supplemental fields
SmeadsoftID
9650
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> SCOPE OF WORK <br /> INDIAN RIVER COUNTY <br /> SOUTH COUNTY WATER TREATMENT PLANT <br /> DESIGN, PERMITTING, BIDDING AND CONSTRUCTION SERVICES FOR CONSTRUCTION <br /> OF PROPOSED WELL NO . 7 AND SANITARY SEWER LINE WITHIN SOUTH COUNTY <br /> PARK <br /> AMENDMENT NO . 1 <br /> BACKGROUND <br /> In August 2009, Indian River County Department of Utility Services (County) authorized Camp <br /> Dresser & McKee Inc . (CDM) to provide design, permitting and construction services associated <br /> with the construction of Well No . 7 at the South County Water Treatment Plant (WTP) . Well No . <br /> 7 is proposed to be constructed in the northwest corner of South County Park, due west of the <br /> WTP location. An initial project kickoff and. siting coordination meeting was held with the <br /> Parks Division and Recreation Department in. September 2009 . <br /> In exchange for the use of the park for a well location, the County Recreation Department <br /> requested that the Utilities Department provide design services and construction of a sanitary <br /> sewer line for the proposed restroom facility within the park . The County requested that CDM <br /> incorporate the design, permitting and construction of this line into the Well No . 7 project. <br /> Additionally, the County has requested that two separate bid packages be prepared (one for the <br /> well and wellhead, and a second for the well pipeline and sanitary pipeline) . As such, <br /> additional services are required to prepare the separate packages . <br /> Due to time constraints associated with both the scrub jay nesting season and the Florida <br /> Department of Environmental Protection (FDEP) grant that is being used to fund. the restroom <br /> and park improvements projects, CDM has already completed many of the services presented <br /> below . These costs were already incurred in an effort to meet- the aforementioned deadlines . <br /> The following is the scope of services to be provided under this authorization, amended to <br /> reflect the above changes . <br /> SCOPE OF SERVICES <br /> The following is a summary of original tasks included in Work Order No . 13, to be amended as <br /> noted . <br /> TASK 1 . 0 PRE-APPLICATION MEETING WITH ST. JOHNS RIVER WATER <br /> MANAGEMENT DISTRICT (SJRWMD) <br /> In addition to the meeting with SJRWMD, CDM conducted two additional meetings with the <br /> County' s Recreation Department regardu1g the details surrounding the proposed sanitary <br /> sewer line, as well as one additional meeting with the Fish and Wildlife Service (FWS) <br /> regarding the disturbances to the conservation area from routing the sanitary line through this <br /> area . This task has been completed . The labor estimate provided in the attached budget reflects <br /> cm 1 p2756.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.