Laserfiche WebLink
CDM / ITS will collect water level data for the groundwater monitor wells and staff gauges prior to <br /> the sampling event. <br /> CDM / ITS will also perform semi - annual (January and July) sampling of the two surface water sites <br /> for analysis of the list of Semi - Annual Surface Water Parameters identified in Paragraph 14 of the <br /> MPIS included in Permit Nos . SC31 - 0128769 - 019 and S031 - 0128769 - 020 and annual leachate <br /> sampling from the currently constructed leachate monitoring site ( L4 ) for analysis of the list of <br /> Annual Leachate Parameters identified in Paragraph 17 of the MPIS ( Permit Nos . SC31 - 0128769 - <br /> 019 and 5031 - 0128769 - 020) . <br /> It is estimated that data collection and sampling will take five days to complete per sampling event. <br /> In the event that FDEP requires resampling of groundwater monitoring wells, the labor and <br /> materials will be invoiced under Task 4 of this Scope of Services . If the resampling is the result from <br /> errors made by the sampling staff, IRC will not be invoiced . CDM / ITS will deliver the samples to the <br /> ENCO Orlando office for analysis . <br /> ENCO will perform the laboratory analysis under IRC SWDD ' s contract. CDM will assist IRC SWDD <br /> in coordinating the analytical testing activities with ENCO, notify FDEP prior to sampling as <br /> required by the MPIS, review and evaluate the analytical test results, and prepare the semi - annual <br /> reports . <br /> CDM will prepare two semi - annual reports that will be submitted to FDEP within 60 days of receipt <br /> of valid laboratory results from the laboratory that is contracted by IRC SWDD to analyze samples . <br /> Services included in preparing the semi - annual reports entail : <br /> ■ Review of laboratory results with respect to FDEP groundwater quality criteria and historical <br /> laboratory results . If review of the data indicates potential errors in the results or concentrations <br /> of analyses that could potentially result in enforcement action, CDM will notify IRC SWDD prior <br /> to preparing the report and request confirmatory samples, if needed. <br /> ■ Preparation of semi - annual monitoring reports for the January and July monitoring events . The <br /> reports will include brief discussions of the results, water level contour maps, and copies of the <br /> analytical reports . A draft report will be submitted for review, if requested . <br /> ■ CDM will prepare three copies of the final report for submittal to FDEP and will provide one file <br /> copy to IRC SWDD . <br /> IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other electronic <br /> format accepted by FDEP) . <br /> TASK 3 . 0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br /> Title V Permit No . 0610015 - 003 -AV, which is the current permit as of the date of this work order, <br /> contains monitoring and reporting requirements related to the landfill gas collection and control <br /> system . CDM will assist IRC SWDD , as described below, in fulfilling all air permit requirements and <br /> conditions within the required regulatory timeframes . <br /> A ' 3 ,l3410.docx <br />