Laserfiche WebLink
Statement of Compliance <br /> CDM will prepare and submit the annual Statement of Compliance for the IRC Landfill . This <br /> document must be submitted to FDEP within 60 days after the end of the calendar year, as required <br /> by Rule 62 - 213 . 440 ( 3 ) (a) ( 2 ) , F.A. C . <br /> Annual Operating Report <br /> CDM will prepare and submit the Annual Operating Report for the IRC Landfill . This report must be <br /> submitted to FDEP on or before April 1 of each calendar year using the annual operating report <br /> form for an air pollutant emitting facility, as required by Rule 62 - 210 . 370 ( 3 ) , F.A. C . <br /> CDM will estimate the annual emission rates of non - methane organic compounds and volatile <br /> organic compounds from the landfill gas to determine the IRC Landfill ' s status with regard to <br /> operation and reporting requirements of the active landfill gas collection and control system under <br /> the New Source Performance Standards requirements . <br /> Annual Emissions Fee <br /> IRC SWDD is responsible for providing CDM with the required fee. CDM will submit the annual <br /> emissions fee documentation to FDEP between January 15 and March 1 using completed FDEP <br /> Form 62 - 213 . 900 ( 1 ) . <br /> Visible Emissions Testing <br /> CDM will contract with a certified observer to perform the annual visible emissions test in order to <br /> determine the opacity of the flare. CDM will provide oversight of the annual visible emission testing <br /> of the flare, notify FDEP of the time and location of the test, and prepare and submit to FDEP a <br /> report of the test results . <br /> TASK 4 . 0 - GENERAL TECHNICAL AND MISCELLANEOUS PERMIT COMPLIANCE ASSISTANCE <br /> CDM will provide general technical and permit compliance assistance to IRC SWDD staff on an as <br /> needed basis . IRC SWDD staff is performing a number of the tasks required annually by the current <br /> FDEP landfill permits . CDM will provide support as needed for the SWDD staff as they perform <br /> these tasks . <br /> Each task will be authorized and documented up to the budgeted amount for each task. General <br /> technical and permit compliance assistance tasks may include : <br /> ■ Reporting required by the Multi - Sector Generic Permit for stormwater discharge ; <br /> ■ Quarterly monitoring and reporting of the landfill gas monitoring wells located at the IRC <br /> Landfill site boundary, as well as enclosed structures located on site ; <br /> ■ Submittal of records of groundwater dewatering volumes to St. Johns River Water Management <br /> District in compliance with the consumptive use water permit; <br /> ■ Preparing agenda items for and attending IRC Board of County Commissioners meetings, <br /> ■ Developing annual IRC SWDD budgets, and <br /> ■ Miscellaneous permit renewals or technical support <br /> ■ Sampling and reporting for additional monitor wells, surface water, leachate , etc . <br /> A4 j13410.docx <br />