Laserfiche WebLink
procedures can be modified to meet the actual conditions encountered in the field . CDM will <br /> observe and document the following during pile driving : <br /> ® Record the penetration resistance <br /> ® Verify that the required penetration resistance and minimum pile tip are achieved for each <br /> pile <br /> ® Document the length of pile driven <br /> The results of the monitoring will be summarized in a report upon completion of the pile <br /> installation program and will include the following : <br /> ® A summary of the field activities observed by CDM <br /> ® Location plan of production pile installation using a provided base plan <br /> ® The results of dynamic load tests <br /> ® Logs of the test piles and production piles <br /> CDM will subcontract with John H . Dean Architect & Associates to provide general onsite <br /> structural engineering design services during pile installation. CDM reserves the right to <br /> request additional compensation, should construction require significant deviations from the <br /> plans . <br /> The requested budget amendment for Task 6 is included in Table 1 . <br /> A-6 j12572.doc <br />