Laserfiche WebLink
interpreter of the requirements of the Contract Documents regarding the execution and <br /> progress of the work . <br /> Subtask 5. 8 Resident Services During Construction <br /> The activities performed under this subtask consist of inspections of the work during the <br /> construction and implementation of the project to observe the performance of the work . <br /> CDM will make weekly visits to the site to observe the progress and quality of the executed <br /> work and to determine, in general, if such work is proceeding in accordance with the permit <br /> documents . During such visits and on the basis of on-site observations, CDM shall keep IRC <br /> SWDD informed of the progress of the work, shall endeavor to guard IRC SWDD against <br /> defects and deficiencies in such work and may disapprove or reject work as failing to conform <br /> to the design drawings and permit doctunents . <br /> The original Scope of Services included up to 4 hours per week for resident inspection services . <br /> Due to the complexity of this project, additional resident inspection services are required . This <br /> amendment will provide up to an additional 4 hours per week (8 hours total per week) for <br /> resident inspection services over the 9 month anticipated construction period . The level of work <br /> estimated for this project is 288 (36 weeks X 8 hrs / week) man-hours of project representative <br /> time based on a 9 month construction period . CDM reserves the right to request additional <br /> compensation, should construction extend beyond the 288 hour period . IRC SWDD will provide <br /> any additional inspection services that may be required beyond the time that is provided in this <br /> Scope of Services . During times that CDM is not onsite, IRC SWDD will be responsible for <br /> monitoring construction activities and reporting special and unusual events . IRC SWDD will <br /> provide an onsite resident inspector for a minimum of 8 hours per week . IRC SWDD shall <br /> provide daily reports to CDM . <br /> The requested budget amendment for Task 5 is included in Table 1 . <br /> TASK 6. 0 - SPECIAL ENGINEERING SERVICES DURING CONSTRUCTION <br /> The driven pile system described in Task 1 above will require dynamic load testing and <br /> monitoring of production piles during construction . This amendment will add Subtask 6 . 4 to <br /> the Scope of Services . <br /> Subtask 6.4 Production Pile Monitoring <br /> CDM will arrange for a dynamic pile load testing program. The program will consist of driving <br /> two piles instrumented with the Pile Driving Analyzer (PDA) equipment, one on each side of <br /> the proposed ramp . CDM will subcontract with GRL Engineers, Inc . , the developers of the PDA, <br /> to perform this testing . The results of this testing will be processed with Case Pile Wave <br /> Analysis Program and used in Wave Equation Analyses to establish optimum pile driving <br /> criteria to be used during production-pile driving and to establish production pile lengths . <br /> Monitoring of a static load test, if required, is not included in this Scope of Services . <br /> CDM will provide monitoring services during installation of production piles . CDM will <br /> provide a qualified geotechnical engineer to monitor pile installation . CDM' s representative will <br /> monitor the installation program in the field so that the depths of penetration and pile driving <br /> A-5 i 2572 . doc <br />