Laserfiche WebLink
� q <br /> EXHIBIT A <br /> i <br /> SCOPE OF PROFESSIONAL SERVICES <br /> AMENDMENT N0 . 2 <br /> i <br /> INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br /> OSLO CUSTOMER CONVENIENCE CENTER DESIGN SERVICES <br /> The new solid waste Oslo Customer Convenience Center (CCC) is proposed to be constructed on the <br /> piece of property immediately adjacent to the existing Oslo CCC on the old Oslo dump site . The <br /> proposed improvements included in the design of the new Oslo CCC were paved access roads and <br /> parking/ drive areas, attendant office, covered household hazardous waste and oil <br /> collection/storage area, restroom' facilities , and a retention pond for stormwater treatment and <br /> attenuation . The new Oslo CCC consisted of an earthen- filled ramp raised approximately 12 feet <br /> above existing grade . The top -length and top -width of the ramp was designed to be approximately <br /> 200 feet and 120 feet, respectively. A retaining wall system was to be used around the perimeter to <br /> retain the fill and allow roll - off transfer equipment to be used on the lower level . Access roads and <br /> ramp areas were to be built to accommodate traffic to and from the new CCC . The " elevated" <br /> platform-type design of the new Oslo CCC was based on the new Fellsmere CCC, which began <br /> operating in January 2010 and was established as Indian River County Solid Waste Disposal <br /> District' s (IRC SWDD) standard for construction of all new CCCs in IRC . <br /> The design was recently completed and bids were received on March 4, 2011 . Due to the driven pile <br /> system and structural elements of the construction required by the complexities of the site, <br /> potential environmental impacts, and regulatory requirements associated with constructing on an <br /> old solid waste dump site, the bid amounts exceeded capital costs that are considered to be <br /> acceptable during this time of economical restraint and overall budget challenges . It was <br /> determined that it may not be appropriate to proceed with construction of the new Oslo CCC with <br /> the " elevated " platform - type structure, which is IRC SWDD ' s current standard for construction of all <br /> new CCCs . <br /> An evaluation of alternative design and operation options for the new Oslo CCC , which may be more <br /> economically appropriate given the financial situation that currently exists, should be performed . <br /> Such alternative options can include a " flat" on grade - type facility. This would eliminate the major <br /> expenses of an "elevated" platform -type structure associated with the driven pile system, which is <br /> required to support the concrete masonry unit (CMU) retaining wall and concrete footers, due to <br /> the solid waste that is buried at the site . <br /> Camp Dresser & McKee Inc . , (CDM ) has performed some preliminary investigations on a " flat" on <br /> grade - type facility that utilizes stationary compactors with enclosed roll - off storage containers for <br /> transport of residential solid waste to the landfill . It appears that this type of concept could provide <br /> a clean, convenient, economical, and easily operated facility for the residents that utilize the Oslo <br /> CCC . Based on discussions with IRC staff, the operator of the existing Oslo CCC; a solid waste <br /> compactor manufacturer representative, and a visit to a similar facility in Marion County, Florida, <br /> the stationary compactors with enclosed roll - off storage containers could be used to transport <br /> municipal solid waste, cardboard, paper, and mixed recyclables to the landfill . Open top roll ; off <br /> A- 1 j 13158 .doc <br /> 1 <br />