Laserfiche WebLink
containers could be used to transport yard waste, recyclable metals, and tires to the landfill for <br /> processing. Household hazardous waste ( HHW) could be collected at the proposed covered HHW <br /> and oil collection/storage area . A conceptual design and further engineering analysis of this concept <br /> should be performed so that additional information can be obtained to determine the impact on the <br /> site plan and environmental permits that have already been obtained for this project. <br /> This amendment includes additional engineering services to provide a conceptual design and <br /> I <br /> further engineering analysis of this concept so that additional information can be obtained to <br /> determine the impact on the site plan and environmental permits. The additional Scope of Services j <br /> for this project is described below. <br /> SCOPE OF SERVICES <br /> CDM will undertake the following Scope of Services : <br /> PHASE I - DATA COLLECTION DESIGN PERMITTING AND BIDDING <br /> TASK 1 . 0 - DESIGN SERVICES <br /> This task consists of the development of a conceptual design and preliminary engineering analysis <br /> of a " flat" on grade- type facility that utilizes stationary compactors with enclosed roll - off storage <br /> containers for transport of residential solid waste to the landfill . <br /> Subtask 1 . 1 IRC SWDD Meeting <br /> CDM will attend up to three meetings with IRC SWDD to discuss the proposed conceptual site <br /> layout of the Oslo Convenience Center. During the initial meeting, IRC SWDD shall define their <br /> requirements (location, facilities, configuration, etc .) . The remaining two meeting shall be reserved <br /> for IRC SWDD to review and provide comments of the conceptual layout developed by CDM in <br /> Subtask 1 . 3 discussed below. <br /> Subtask 1 . 2 Data Collection and Review <br /> CDM will review and compile available information related to the project including the following: <br /> ■ Solid waste compactor specifications and layouts <br /> ■ Existing site geotechnical, geologic, and hydrogeologic reports including geologic studies, well <br /> logs and stratigraphic descriptions, hydrological studies, and existing geotechnical reports . <br /> ■ Existing permits and previous permit submittals . <br /> Subtask 1 . 3 - Conceptual Site Layout <br /> Based on the discussions during meetings with IRC SWDD (Subtask 1 . 1 ) and existing information <br /> obtained in Subtask 1 . 2 , CDM will develop a conceptual site layout. The conceptual site layout will <br /> be used for further analysis of the new concept to determine the impact on the site plan and <br /> environmental permits that have already been obtained for this project. CDM will provide an initial <br /> conceptual and up to two revisions based on review comments received from IRC SWDD , <br /> A- 2 113158.doc <br />