Laserfiche WebLink
i <br /> i <br /> CDM will prepare a letter discussing the feasibility of the new conceptual layout for construction at <br /> the Oslo site and a preliminary budget- level opinion of probable construction costs of-the new <br /> i <br /> proposed Oslo CCC . The letter will also identify the impacts to the site plan and environmental <br /> permits . Based on the final new conceptual layout and our understanding of the required design <br /> and permit modification, CDM will prepare an amendment for additional design, permitting, <br /> bidding, and construction services for approval by the IRC Board of County Commissioners ( BOCC) . <br /> CDM will assist IRC SWDD with the preparation of presentation materials necessary for presenting <br /> the proposed new conceptual layout to the IRC BOCC . CDM will attend one IRC BOCC meeting to <br /> provide IRC SWDD staff with technical assistance during the meeting. <br /> CDM reserves the right to request additional compensation should IRC SWDD request additional <br /> meetings or revisions to the conceptual layout beyond those provided in the Scope of Services of <br /> this amendment described above . <br /> i <br /> i <br /> A- 3 J 13158.doc <br />