My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-072
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:48:54 AM
Creation date
10/1/2015 6:06:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/20/2014
Control Number
2014-072
Agenda Item Number
8.G.
Entity Name
CB & I Coastal Planning Engineering
Subject
Beach and Dune Restoration Project
Work Order No. 5
Area
Sector 3
Alternate Name
Coastal Planning & Engineering, Inc.
Supplemental fields
SmeadsoftID
13194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 11, 2014 <br />Revised May 1, 2014 <br />James Gray <br />Indian River County <br />Public Works - Coastal Engineering Division <br />1801 27th St, Building A <br />Vero Beach FL 32960 <br />EXHIBIT 1 <br />CB&I Coastal Planning & Engineering, Inc. <br />2481 NW Boca Raton Blvd <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.CBI.com <br />Subject: Work Order #5 <br />Indian River County Sector 3 Beach Restoration Project <br />Post Construction and Baseline Physical Monitoring Services - 2014 <br />Dear James: <br />This proposal outlines a scope of work for CB&I Coastal Planning & Engineering, Inc. (CB&I), f/k/a Coastal <br />Planning & Engineering, Inc. to provide services in support of one year of annual physical monitoring to fulfill <br />FDEP and USACE permit requirements of the Sector 3 Beach and Dune Restoration Project constructed between <br />2010 and 2012. This proposal also includes a third party peer review of the UMAM Analysis performed by CSA, <br />and if necessary, quantification of hardbottom impacts. <br />The 2014 Physical Monitoring Services entails the following: <br />• "Year 3" annual post construction physical monitoring of the Phase 2 project area (R-26+500 — R-36), <br />• "Year 2" annual post construction physical monitoring of the Phase 2b project area (R-20 — R-26+500), <br />and <br />• Baseline pre -construction physical monitoring for the Sector 3 Dune Repair Project Area (R-24 — R-55). <br />Physical Monitoring Report <br />The Indian River County Sector 3 Beach and Dune Restoration Project was constructed under permitting <br />authority of the Florida Department of Environmental Protection (FDEP) and United States Army Corps of <br />Engineers (USACE). These permits (FDEP permit No. 0285993 -001 -JC and USACE Permit SAJ-2007-01645) <br />contain permit conditions pertaining to construction and post -construction periods. FDEP permit condition 56 (d) <br />requires an engineering report be submitted to the FDEP within 90 days following completion of each post - <br />construction survey. <br />We understand that Morgan & Eklund will perform the physical monitoring from R-30 to R-60, and be <br />responsible for certifying the survey data and submitting a survey report to the FDEP. Land & Sea Surveying <br />Concepts, Inc., via a separate contract with the Sebastian Inlet District, will perform the physical monitoring from <br />R-20 to R-30. They will certify the survey data and submit a separate survey report to the FDEP. CB&I will <br />review both data sets to ensure that it conforms to the standards required by the FDEP physical monitoring plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.