Laserfiche WebLink
Samples from six surface water sites shall be collected in January and July. Samples from two of the <br /> locations associated with the stormwater pond and outfall will be analyzed for the list of Semi = <br /> Annual Surface Water Parameters identified in Paragraph 14 of the MPIS, which is included by <br /> reference in Permit Nos. SC31 - 0128769 - 019 and S031 = 0128769- 020. Samples from the remaining <br /> four locations will be analyzed for the parameters listed in the Second Request for Additional <br /> Information, Permit Renewal Application 5031 - 0128769-021 dated July 5 , 2012 and the response <br /> by CDM Smith on behalf of IRC dated July 16, 2012. <br /> CDM Smith will assist IRC SWDD Staff with the field sampling activities. Analytical testing will be <br /> conducted by Environmental Conservation Laboratories (ENCO), the analytical laboratory <br /> contracted by IRC SWDD . The results of the semi-annual water quality monitoring events will be <br /> reported to FDEP within 60 days of receipt of analysis from the laboratory as required by <br /> Paragraph 29 of the MPIS and Chapter 62401 . 510 (9) (a), which is included by reference in Permit <br /> Nos. SC31 - 0128769- 019 and S031 = 0128769 - 020. <br /> The IRC Landfill also operates under a Title V permit (Permit No: 0610015 =004-AV) issued on July <br /> 16, 2012, which contains monitoring and reporting requirements related to the landfill gas <br /> collection and control system. IRC SWDD is required to prepare and submit the following to FDEP <br /> and the U.S. Environmental Protection Agency (USEPA) , Region 4 : <br /> ■ Annual Statement of Compliance (within 60 days after the end of the calendar year) ; <br /> ■ Annual Operating Report (on or before April 1 of the following year) ; and <br /> ■ Results of an annual flare visible emissions test (within 45 days of testing) . <br /> SCOPE OF SERVICES <br /> CDM Smith will undertake the annual permit compliance monitoring and reporting, which will <br /> include the following tasks : <br /> Task 1 : Project Quality Management <br /> Task 2 Semi=Annual Water Quality Sampling and Reporting <br /> Task 3 : Title V Permit Compliance and Reporting; and <br /> Task 4 : General Technical and Miscellaneous Permit Compliance Reporting <br /> The below Scope of Services is based on regulations and monitoring and reporting requirements as <br /> of the authorization date of this Work Order. An amendment to this Scope of Services may be <br /> needed if there are any regulatory changes that result in additional work. <br /> TASK 1 .0 - PROJECT QUALITY MANAGEMENT <br /> Activities performed under this task consist of those generally administrative functions required to <br /> assure that the project remains on schedule, within budget, and that the quality of the work <br /> products defined within this scope is consistent with CDM Smith's standards and IRC SWDD 's <br /> expectations. <br /> CDM Smith will meet with IRC SWDD staff monthly for project planning and coordination . CDM <br /> Smith's project manager will prepare and submit monthly status reports and attend status <br /> reporting meetings throughout the life of the project. It is estimated that meetings will be held on <br /> the average of once a month. Preparation of invoices and project administration will also be <br /> performed under this task. <br /> A' 2 JJ1037.docx <br />