Laserfiche WebLink
TASK 2 . 0 -SEMI -ANNUAL WATER QUALITY SAMPLING AND REPORTING <br /> CDM Smith will assist IRC SWDD with all sampling preparation activities, including scheduling, <br /> staffing, subcontracting, and field equipment preparation . CDM Smith will perform the field testing, <br /> sample collection, and water- level measurements. CDM Smith will contract with Ideal Tech Services <br /> Inc. (ITS) to perform the groundwater and surface water sampling. CDM Smith / ITS will perform the <br /> semi-annual (January and July) sampling of the Class I and construction and demolition (C&D) <br /> debris landfill groundwater monitor wells (42 in January and 24 in July) for the list of Semi=Annual <br /> Ground Water Parameters identified in Paragraph 8 of the MPIS, included in Permit Nos.. <br /> SC31 - 0128769 - 019 and S031 = 0128769 - 020 as modified by the Second Request for Additional <br /> Information, Permit Renewal Application S031 - 0128769- 021 dated July 5, 2012 and the response <br /> by CDM Smith on behalf of IRC dated July 16, 2012 . CDM Smith/ ITS will collect water level data for <br /> the groundwater monitor wells and staff gauges prior to the sampling event. <br /> CDM Smith/ITS will also perform semi -annual (January and July) sampling of the six surface water <br /> sites for analysis of the list of Semi-Annual Surface Water Parameters identified in Paragraph 14 of <br /> the MPIS included in Permit Nos. SC31 . 0128769 -019 and S031 - 0128769 = 020 as modified by the <br /> Second Request for Additional Information, Permit Renewal Application S031 - 0128769 - 021 dated <br /> July 5, 2012 and the response by CDM Smith on behalf of IRC dated July 16, 2012 . It is estimated <br /> that data collection and sampling will take five days to complete per sampling event. In the event <br /> that FDEP requires resampling of groundwater monitoring wells, the labor and materials will be <br /> invoiced under Task 4 of this Scope of Services. If the resampling is the result from errors made by <br /> the sampling staff, IRC will not be invoiced. CDM Smith/ITS will deliver the samples to the ENCO <br /> Orlando office for analysis. <br /> ENCO will perform the laboratory analysis under IRC SWDD's contract. CDM Smith will assist IRC <br /> SWDD in coordinating the analytical testing activities with ENCO, notify FDEP prior to sampling as <br /> required by the MPIS, review and evaluate the analytical test results, and prepare the semi-annual <br /> reports, <br /> CDM Smith will prepare two semi-annual reports that will . be submitted to FDEP within 60 days of <br /> receipt of valid laboratory results from the laboratory that is contracted by IRC SWDD to analyze <br /> samples. Services included in preparing the semi-annual reports entail : <br /> ■ Review of laboratory results with respect to FDEP groundwater quality criteria and historical <br /> laboratory results. If review of the data indicates potential errors in the results or concentrations <br /> of analyses that could potentially result in enforcement action, CDM Smith will notify IRC SWDD <br /> prior to preparing the report and request confirmatory samples, if needed. <br /> ■ Preparation of semi-annual monitoring reports for the January and July monitoring events. The <br /> reports will include brief discussions of the results, water level contour maps, and copies of the <br /> analytical reports. A draft report will be submitted for review, if requested. <br /> ■ CDM Smith will prepare three copies of the final report for submittal to FDEP and will provide <br /> one file copy to IRC SWDD. <br /> IRC SWDD will provide copies of analytical reports in electronic format (AdApt, or other electronic <br /> format accepted by FDEP) . <br /> A- 3 01037.aoc. <br /> r <br />