My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-014
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 10:33:10 AM
Creation date
10/1/2015 4:59:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/15/2013
Control Number
2013-014
Agenda Item Number
15.B.3
Entity Name
CDM Smith Inc.
Subject
Work Order No. 7 Enginneering Services
2013 Annual Permit Compliance
Supplemental fields
SmeadsoftID
11693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSUMPTIONS <br /> ■ This Scope of Services and cost proposal is based on solid waste operations Permit Nos. <br /> SC31- 0128769 - 019 and S031 - 0128769 -020 and the groundwater monitor wells, leachate <br /> sampling sites, and surface water monitor sites that are installed as of the date of this work <br /> order. <br /> ■ CDM Smith understands that additional new or replacement groundwater monitor wells will be <br /> installed in the future under Permit Nos. SC31 - 0128769 -019 and S031w0128769 = 020 . Sampling <br /> of proposed new or replacement groundwater monitor wells required by Permit Nos. SC31 - <br /> 0128769-019 and S031 -0128769 - 020 beyond those currently installed and monitored (40 in <br /> January and 24 in July) are not included this Scope of Services. <br /> ■ Assistance in revising the MIPS is not included in this Scope of Services. <br /> ■ Laboratory analysis is not included in this Scope of Services. <br /> ■ This Scope of Services and cost proposal is based on the Title V Permit No . 0610015 - 004-AV, <br /> which is the current permit as of the date of this work order. <br /> ■ This Scope of Services does not include meetings with the Florida Department of <br /> Environmental Protection, <br /> DATA OR ASSISTANCE TO BE PROVIDED BY IRC SWDD <br /> ■ Existing data available on construction of the existing groundwater monitor wells <br /> ■ Available site surveys <br /> ■ Available record information <br /> ■ Laboratory analytical reports and direct access to laboratory personnel <br /> ■ Access to sampling site <br /> ■ Annual Emissions fee (IRC SWDD qualifies for the one-time 2012 Title V Fee Discount) <br /> PROJECT SCHEDULE <br /> The following project schedule has been developed based on receiving authorization on before <br /> December 20, 2012 . <br /> Task 1 : January 1, 2013 through December 31, 2013 <br /> Task 2 : January 2013 and July 2013 (Includes sampling events, review and validation of results, <br /> and completion/submittal of reports within 60 days of receipt of laboratory analysis) <br /> Task 3 : Statement of Compliance March 1, 2013 <br /> Annual Operating Report April 1, 2013 <br /> Semi-Annual Operating Report March 1 , 2013 and September 1 , 2013 <br /> Annual Emissions Fee Between January 15, 2013 and March 1, 2013 <br /> Task 4 : January 1, 2013 through December 31 , 2013 <br /> A' 5 711037.doez <br />
The URL can be used to link to this page
Your browser does not support the video tag.