My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-066
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:04:32 AM
Creation date
10/1/2015 5:13:58 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` CLOS DEDUCTIVE <br /> p�TTAC HMsT (� o • CHANGE <br /> Construction, LLC <br /> ORDER <br /> PROJECT: Modifications to the Egret Marsh CHANGE ORDER NUMBER: <br /> (Name, address) 7295 4th Street DATE : 11 . 28 . 2012 <br /> Vero Beach , FL : ARCHITECTS PROJECT NO 0435A <br /> CONTRACT DATE : 1 1 . 07 . 2012 <br /> CONTRACTOR: Close Construction , LLC CONTRACT FOR: <br /> (Name, address) 301 N . W. 4th Ave. <br /> Okeechobee , FL 34972 <br /> The Contract is changed as follows: <br /> The deletion of the vapor barrier, tape and labor and excavating 2 " in lieu of 6 " <br /> for elevation change in floway and deletion of the mixing of existing material in place . <br /> Delete Vapor Barrier, Tape and Labor (See attached breakdown ) ( $3 , 089 . 00 ) <br /> Excavate 2" in lieu of 6" off Floway (See attached breakdown ) ($31268 . 00 ) <br /> Mix existing material in place ($ 31250 . 00 ) <br /> Dozer $81 . 25/hr @ 8 hours = $650 . 00/day <br /> $650/day x 5 days = $3 , 250 . 00 <br /> Change Order Total ($99607 . 00 ) Monello <br /> The original (Contract Sum ) (Guaranteed Maximum Price) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . .$ 1 , 288 , 482 . 00 <br /> Net change by previously authorized Change Orders . . . . . . . . . move obese Done 006964 as memo By mmom * 64 00 offissame 894$ 0 . 00 <br /> The (Contract Sum ) (Guaranteed Maximum Price) prior to this Change Order was . . we 0 46004 0 a Noyes 0 0 by & 063 19288 , 482 . 00 <br /> The (Contract Sum ) (Guaranteed Maximum Price) will be (increased)Sdmemo <br /> ecreased) <br /> (unchanged) by this Change Order in the amount of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . .$ =99607 . 00 <br /> The new (Contract Sum ) (Guaranteed Maximum Price) including this Change Order will bay . . . . . . . . . . .$ 1 , 278 , 875 . 00 <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is 3.09.2013 <br /> NOTE This summary does not reflect changes in the Contract Sum , Contract Time or Guaranteed Maximum Price which have <br /> been authorized by Construction Change Directive. <br /> OWNER CONTRACTOR <br /> Indian River County Close Construction, LLC <br /> Address Address <br /> 1801 27th Street 301 N .W. 4th Ave. <br /> Vero Beach , FL Okeechobee, FL 34972 <br /> BY BY <br /> DATE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.