Laserfiche WebLink
P4�e. 2oF � <br /> CATNOOl INCm <br /> 5550 418' STREET * VERO BEACH, FL 32967 * (772) 5624814 * FAX (772) 562-0173 <br /> CHANGE ORDER # 1 <br /> Date: November 26, 2012 Revised 114942 <br /> To: Close Construction, LLC <br /> 301 Northwest 4`h Ave <br /> Okeechobee, FL 34972 <br /> Re : Modifications to the Egret Marsh Stormwater Park Floway <br /> We hereby agree to make the following changes including labor, materials, equipment and all taxes <br /> to the above referenced project: <br /> L Delete Vapor Barrier, Tape and Labor <br /> a. 14 Rolls of Stego 10 Mill Vapor Barrier & Tape ($29833 . 00) <br /> b. 2 Labors for 8 Hours 256. 00 <br /> Deduct ($3 ,089 .00) <br /> 2 . Excavate 2" In Lieu of 6" For Elevation Change in Floway <br /> a. Deduct Loader 2 Days ($ 947.00) <br /> b. Deduct Grader 2 Days ($ 956.00) <br /> C* Deduct Backdump 2 Days ($ 12109.00) <br /> d. Deduct One Labor for 2 Days 256.00 <br /> Deduct ($3 ,268 .00) <br /> TOTAL DEDUCT ($ 69357.00) <br /> Subject to Existing Contract Conditions and Exclusions <br /> Close Construction, LLC <br /> By <br /> Printed Name: <br /> Date <br /> Cathco Inc. <br /> .ti <br /> By <br /> Matthew S . Eisert, as agent for Cathco, Inc . <br /> Date <br /> 1 <br />