My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-066
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:04:32 AM
Creation date
10/1/2015 5:13:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/02/2013
Control Number
2013-066
Agenda Item Number
8.E.
Entity Name
Close Construction
Subject
Modifications to Egret Marsh Stormwater Park Floway
Area
Egret Marsh Stormwater Park
Project Number
0435A
Supplemental fields
SmeadsoftID
11843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r a ' � I Ital N al FI a IF a f F su <br /> I It x � a <br /> tie3 <br /> Construct a 6" thick 4,000 psi, reinforced concrete curb along both sides of the ATS harvestItts <br /> "'I <br /> t IF <br /> , F . t at <br /> IF <br /> access driveway extension, tying the curb into the existing driveway with epoxyed reinforcing k , . ¢y, <br /> IV <br /> steel . (A curbing extension along both sides of a portion of the newly constructed ATS harvest I `5 £ <br /> "FFI1a1 <br /> ;;Y <br /> aIb <br /> rr <br /> CO1-4a RIaI <br /> . <br /> access driveway is required to transition from the new concrete perimeter curb to the access' F. rya <br /> 3 , <br /> driveway sides. The curbing will prevent soil from eroding from the perimeter berm onto the Fal. I ,, _ k <br /> IF <br /> n� <br /> Ft Far,- ajtIft" <br /> IF <br /> floway surface, and it will increase harvesting efficiency by preventing harvested algae from Flat FIFFFF � <br /> � w I. , ft ' <br /> being washed off of the floway and onto the perimeter berm. ) 1 .FIFIFIA, 3 6. q 7 - _ � � <br /> jaij � _ _ <br /> ' It a <br /> , Y Far I' Pyr"_It <br /> A " s <br /> X Matt 11 <br /> ` It <br /> s A 5 �:. <br /> 11 1 11 II II 1 <br /> at, <br /> f .fir fjr' " r I.y .'3, s `: r t <br /> Construct an 11 tall x 3 wide x 6 thick concrete L curb/retaining wall, 11 m length t > '� $ <br /> a <br /> containing one #5 bar at the outermost east and west ends of the ATS harvest flumes . (This � - <br /> 001-4b enhancement is required to tie the termination of the new floway concrete perimeter curb with `- <br /> at F . IV at <br /> 1 <br /> existing high density polyethylene ( HDPE ) liner material on the east and west harvest flume I % g k � <br /> '.. s �' ; Pi �.y,. . <br /> ends . Without this curb/retaining wall, soil will erode into the harvest flume from thetr <br /> k s <br /> perimeter berm and have a detrimental impact on facility operations . ) = FIFO, ' r -� <br />, <br /> . gFIT IF Far 0 <br /> ty <br /> � . : <br /> rat <br /> IF, IF <br /> at <br /> IF <br /> Repair two leaking ATS feed water manifold pipes by excavating the pipes, encasing the leaking � , <br /> a. c ''! - it: ' .., - <br /> at I <br /> „y e <br /> joints with concrete, backfilling, and compacting . ( HDPE welds on two of the ATS feed water ���� f r <br /> CO1-4c w� IF L%t <br /> j manifold pipes have failed, causing significant underground leakage and loss of soil around the I k { ` <br /> IF <br /> a. � ; � y <br /> pipes. Because these pipes supply water to the ATS floway, it is critical that they are repaired Ec IS <br /> t f <br /> RL <br /> I . <br /> IF <br /> z III �V <br /> I <br /> before the facility is returned to service . ) t IF . � . sWFt, 1. , atto; FIFat <br /> � It <br /> a I, EI It <br /> ? 1 � Ep <br /> ttr t jr OF <br /> g # sLF <br /> Construct a 40' x 6' x 8 thick, 4,000 psi reinforced concrete apron along a portion of the west r # 4 n b <br /> > <br /> O P g g 1t # re at It <br /> at <br /> A It <br /> s ,' com.$ ,i „�x'I #�Ixf6 <br /> .p �, . <br /> side of the algae composting area . Reinforcing shall be #6 bars at 12 centers each direction . hpkr <br /> CO1-4d 3 : a .. <br /> (This reinforced concrete apron will connect the asphalt compost pad with the mulch and arQI m <br /> .. s <br /> finished compost storage areas . The asphalt compost ad edges are cracking and breaking off �� a : � � <br /> P g p P P g g g P <br /> due to heavy equipment regularly traveling between the compost pad and the storage areas . <br /> E <br /> The concrete apron will prevent further cracking and significantly extend the life of the asphalt. ) °, � � r <br /> �' ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.