My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-066
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:04:32 AM
Creation date
10/1/2015 5:13:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/02/2013
Control Number
2013-066
Agenda Item Number
8.E.
Entity Name
Close Construction
Subject
Modifications to Egret Marsh Stormwater Park Floway
Area
Egret Marsh Stormwater Park
Project Number
0435A
Supplemental fields
SmeadsoftID
11843
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` CLOS DEDUCTIVE <br /> p�TTAC HMsT (� o • CHANGE <br /> Construction, LLC <br /> ORDER <br /> PROJECT: Modifications to the Egret Marsh CHANGE ORDER NUMBER: <br /> (Name, address) 7295 4th Street DATE : 11 . 28 . 2012 <br /> Vero Beach , FL : ARCHITECTS PROJECT NO 0435A <br /> CONTRACT DATE : 1 1 . 07 . 2012 <br /> CONTRACTOR: Close Construction , LLC CONTRACT FOR: <br /> (Name, address) 301 N . W. 4th Ave. <br /> Okeechobee , FL 34972 <br /> The Contract is changed as follows: <br /> The deletion of the vapor barrier, tape and labor and excavating 2 " in lieu of 6 " <br /> for elevation change in floway and deletion of the mixing of existing material in place . <br /> Delete Vapor Barrier, Tape and Labor (See attached breakdown ) ( $3 , 089 . 00 ) <br /> Excavate 2" in lieu of 6" off Floway (See attached breakdown ) ($31268 . 00 ) <br /> Mix existing material in place ($ 31250 . 00 ) <br /> Dozer $81 . 25/hr @ 8 hours = $650 . 00/day <br /> $650/day x 5 days = $3 , 250 . 00 <br /> Change Order Total ($99607 . 00 ) Monello <br /> The original (Contract Sum ) (Guaranteed Maximum Price) was . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . .$ 1 , 288 , 482 . 00 <br /> Net change by previously authorized Change Orders . . . . . . . . . move obese Done 006964 as memo By mmom * 64 00 offissame 894$ 0 . 00 <br /> The (Contract Sum ) (Guaranteed Maximum Price) prior to this Change Order was . . we 0 46004 0 a Noyes 0 0 by & 063 19288 , 482 . 00 <br /> The (Contract Sum ) (Guaranteed Maximum Price) will be (increased)Sdmemo <br /> ecreased) <br /> (unchanged) by this Change Order in the amount of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . .$ =99607 . 00 <br /> The new (Contract Sum ) (Guaranteed Maximum Price) including this Change Order will bay . . . . . . . . . . .$ 1 , 278 , 875 . 00 <br /> The Contract Time will be (increased) (decreased) (unchanged) by ( ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is 3.09.2013 <br /> NOTE This summary does not reflect changes in the Contract Sum , Contract Time or Guaranteed Maximum Price which have <br /> been authorized by Construction Change Directive. <br /> OWNER CONTRACTOR <br /> Indian River County Close Construction, LLC <br /> Address Address <br /> 1801 27th Street 301 N .W. 4th Ave. <br /> Vero Beach , FL Okeechobee, FL 34972 <br /> BY BY <br /> DATE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.