Laserfiche WebLink
CLOS <br />onstruction, LLC <br />PROPOSED <br />CHANGE <br />ORDER <br />PROJECT PC South Algal Nutrient Removal <br />(Name, address) Facility <br />1225 5th Street, SW <br />Vero Beach, FL 32962 <br />CONTRACTOR: Close Construction, LLC <br />(Name, address) 301 N. W. 4th Ave. <br />Okeechobee, FL 34972 <br />The Contract is changed as follows: <br />CHANGE ORDER NUMBER: 3R1 <br />DATE: <br />ARCHITECT'S PROJECT NO <br />CONTRACT DATE: <br />CONTRACT FOR: <br />04.22.2014 <br />949 <br />07.16.2013 <br />S outh Relief Canal Pump Station cofferdam installation change as directed by David Gunter of <br />Indian River Farms Water Control District. <br />S ee attached breakdown. <br />Change Order Total <br />$ 253,774.13 <br />The original (Contract Sum) (Guaranteed Maximum Price) was.._ 5 <br />N et change by previously authorized Change Orders S <br />The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was S <br />The (Contract Sum) (Guaranteed Maximum Price) will be (increased)Sdecreased) <br />(unchanged) by this Change Order in the amount of S <br />The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be S <br />The Contract Time will be (increased.) (decreased) junchangedi by <br />5,856,660.20 <br />-21,051.74 <br />5,835,608.46 <br />$ 253,774.13 <br />6,089,382.59 <br />( ) days. <br />N OTE This summary does not reflect changes in the Contract Sum. Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive. <br />O WNER CONTRACTOR <br />Indian River County <br />Address <br />1801 27th Street <br />Vero Beach. FL <br />Close Construction, LLC <br />Address <br />- BY E. <br />301 N.W. 4th Ave. <br />Okeechobee. FL 34972 <br />DATE DATE <br />