My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-065A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:43:09 AM
Creation date
10/1/2015 6:06:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/13/2014
Control Number
2014-065A
Agenda Item Number
8.I.
Entity Name
Close Construction LLC
Subject
Osprey Marsh
PC South Algal Nutrient Removal Facility
Project Number
949
Supplemental fields
SmeadsoftID
13212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOS <br />onstruction, LLC <br />PROPOSED <br />CHANGE <br />ORDER <br />PROJECT PC South Algal Nutrient Removal <br />(Name, address) Facility <br />1225 5th Street, SW <br />Vero Beach, FL 32962 <br />CONTRACTOR: Close Construction, LLC <br />(Name, address) 301 N. W. 4th Ave. <br />Okeechobee, FL 34972 <br />The Contract is changed as follows: <br />CHANGE ORDER NUMBER: 3R1 <br />DATE: <br />ARCHITECT'S PROJECT NO <br />CONTRACT DATE: <br />CONTRACT FOR: <br />04.22.2014 <br />949 <br />07.16.2013 <br />S outh Relief Canal Pump Station cofferdam installation change as directed by David Gunter of <br />Indian River Farms Water Control District. <br />S ee attached breakdown. <br />Change Order Total <br />$ 253,774.13 <br />The original (Contract Sum) (Guaranteed Maximum Price) was.._ 5 <br />N et change by previously authorized Change Orders S <br />The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was S <br />The (Contract Sum) (Guaranteed Maximum Price) will be (increased)Sdecreased) <br />(unchanged) by this Change Order in the amount of S <br />The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be S <br />The Contract Time will be (increased.) (decreased) junchangedi by <br />5,856,660.20 <br />-21,051.74 <br />5,835,608.46 <br />$ 253,774.13 <br />6,089,382.59 <br />( ) days. <br />N OTE This summary does not reflect changes in the Contract Sum. Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive. <br />O WNER CONTRACTOR <br />Indian River County <br />Address <br />1801 27th Street <br />Vero Beach. FL <br />Close Construction, LLC <br />Address <br />- BY E. <br />301 N.W. 4th Ave. <br />Okeechobee. FL 34972 <br />DATE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.