Laserfiche WebLink
Change Order 3 Breakdown <br />Credits <br />S ivers <br />Mobilization - Small Crane <br />Demobilization - Small Crane <br />S ubtotal Credits <br />10% O&P <br />Total Credits <br />Additions <br />Design and Engineering - Ardaman <br />200 Ton Crane Mobilization <br />200 Ton Crane Demobilization <br />200 Ton Crane Rental <br />Sheet Pile Rental - Existing rented sheets <br />S heet Pile Rental -Additional sheets required <br />Additional Sheet Pile Return Freight <br />I -Beam Rental <br />S heet Pile Installation - Costello Bros. <br />S heet Pile Removal - Costello Bros. <br />Dewatering -8" Open Pump <br />Includes two 8" pumps <br />Dewatering - Well Points <br />Open Pump - Fuel <br />Based on using 8 gallons per hour for 35 days <br />Well Points - Fuel <br />Based on using 3 gallons per hour for 35 days <br />Subtotal Additions <br />10% O&P <br />Total Additions <br />Net Change <br />Balance remainingfrom deductive CO 1. <br />Net Increase in contract value: <br />Insurance - 1% <br />Bond - $11.11 per one thousand increase. <br />Change Order Total: <br />Quantity Unit <br />- 5 Days <br />- 1 LS <br />- 1 LS <br />1 LS <br />1 Each <br />1 Each <br />8 Week <br />8 Week <br />8 Week <br />1 LS <br />8 Week <br />1 LS <br />1LS <br />8 Week <br />Unit Price <br />$ 2,200.00 <br />$ . 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 7,490.00 <br />$ • 7,490.00 <br />$ 7,891.25 <br />$ 702.03 <br />$ 436.82 <br />$ 1,500.00 <br />$ 637.40 <br />$ 75,550.00 <br />$ 20,000.00 <br />$ 834.60 <br />8 Week $ <br />6,720 Gallons $ <br />2,520 Gallons $ <br />977.78 <br />4.00 <br />4.00 <br />Total <br />$ (11,000.00) <br />$ (3,500.00) <br />$ (3,500.00) <br />$ (18,000.00) <br />$ (1,800.00) <br />$ (19,800.00) <br />$ 3,500.00 <br />$ 7,490.00 <br />$ 7,490.00 <br />$ 63,130.00 <br />$ 5,616.24 <br />$ 3,494.56 <br />$ 1,500.00 <br />$ 5,099.20 <br />$ 75,550.00 <br />$ 20,000.00 <br />$ 6,676.80 <br />$ 7,822.24 <br />$ 26,880.00 <br />$ 10,080.00 <br />$ 244,329.04 <br />$ 24,432.90 <br />$ 268,761.94 <br />$ 248,961.94 <br />$ (21,051.74) <br />$ 227,910.20 <br />$2,279.11 <br />$2,533.08 <br />$ 253,774.13 <br />