Laserfiche WebLink
6 . 03 Final Payment <br /> A. Upon final completion and acceptance of the Work in accordance with paragraph 14 . 07 of <br /> the General Conditions , OWNER shall pay the remainder of the Contract Price as <br /> recommended by ENGINEER as provided in said paragraph 14 . 07 . <br /> ARTICLE 7 = INDEMNIFICATION <br /> 7 . 01 CONTRACTOR shall indemnify OWNER , ENGINEER , and others in accordance with <br /> paragraph 6 . 20 ( Indemnification) of the General Conditions to the Construction Contract . <br /> ARTICLE 8 - CONTRACTOR' S REPRESENTATIONS <br /> 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations : <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost, progress , and performance of the <br /> Work. <br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost , progress , and performance of the Work . <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the <br />Site <br /> (except Underground Facilities) which have been identified as provided in paragraph 4 . 02 <br /> of the General Conditions and (2) reports and drawings of a Hazardous Environmental <br /> Condition , if any , at the Site which have been identified as provided in paragraph 4 . 06 of <br /> the General Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all examinations , investigations , explorations , tests , studies , and data concerning <br /> conditions (surface , subsurface , and Underground Facilities) at or contiguous to the Site <br /> which may affect cost , progress , or performance of the Work or which relate to any aspect <br /> of the means , methods , techniques , sequences, and procedures of construction to be <br /> employed by CONTRACTOR , including applying the specific means , methods , <br /> techniques , sequences , and procedures of construction , if any , expressly required by the <br /> Contract Documents to be employed by CONTRACTOR , and safety precautions and <br /> programs incident thereto <br /> F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents . <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> 00520 - Agreement - ADDENDUM No . 2 <br /> ADDENDUM NO . 2 00520 - 3 <br /> 11Fileserver2lPubliclPurchasinglBids12012-2013 FY (2013000)12013030 PC South Brine Disposa1100520 - Agreement - ADDENDUM No. 2. doc Rev. 05/01 <br />