My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-105
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:46:28 PM
Creation date
10/1/2015 2:12:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/03/2011
Control Number
2011-105
Agenda Item Number
12.I.2
Entity Name
Coastal Technology Corporation
Subject
Sector 3 Beach Restoration Phase 1 and 2 Post Construction Monitoring
Work Order No.11 Work Order Tasks 5-9
Area
Beach Sector 3
Supplemental fields
SmeadsoftID
9669
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Sector 3 Phase 2 - Construction Phase Services <br /> Scope of Work <br /> (o) Confer with existing Marine Turtle Permit Holders to coordinate work ( see Part 3) . <br /> (p) Perform compaction testing along the Phase 1 and 2 Project area (per FDEP Specific <br /> Condition 23 ) <br /> (q) Take representative photographs along each fill acceptance section and compile them in a <br /> document to photo-document that the Contractor tilled the beach following completion of <br /> each fill acceptance section of Phase 2 . <br /> (r) Monitor the Contractor' s dune planting and submit an as -built (Phase 2) report within 30 days <br /> of planting completion and a post-Phase 1 annual post-construction dune vegetation <br /> monitoring report to FDEP (per FDEP Specific Condition 14) . <br /> During construction, COASTAL TECH will : <br /> ( a) Analyze pre-construction surveys (obtained via prior authorization as "post-Phase 1 <br /> Construction Survey" under WORK ORDER NUMBER 8) to re-assess the estimated volume <br /> required for construction. <br /> (b) Amend the Technical Specifications and Drawings to incorporate amendments as may be <br /> required by FDEP Notice to Proceed and updated survey data . <br /> (c) Produce and deliver five (5) sets [two (2) for the COUNTY and three (3) for the Contractor] <br /> of the amended Technical Specifications and Drawings to the COUNTY with digital copies <br /> furnished to the COUNTY upon request. <br /> (d) Conduct site visits at the mine and construction area (if allowed access to the mine) to spot <br /> check the Contractor ' s progress and construction. <br /> (e) Perform independent spot-check sampling (obtained during site-visits by COASTAL TECH <br /> or otherwise provided by the COUNTY ) and analysis (< 25 samples) of sediment samples to <br /> check the Contractor ' s compliance with the Sediment QA/QC Plan . <br /> (f) Check the work for substantial compliance with the Drawings , General Conditions, Technical <br /> Provisions, applicable permits , and the Construction Contract. <br /> (g) As may be requested by the COUNTY , review up to two (2) Change Orders for approval by <br /> the COUNTY and Contractor. <br /> (h) Prepare Construction Field Directives . <br /> (i) Interpret the Contract Documents . <br /> 0 ) Seek to resolve claims by the Contractor and/or COUNTY . <br /> (k) Consult and advise the COUNTY relative to progress and requirements of the Project . <br /> (1) Review payment applications from the Contractor, and prepare Certificates recommending <br /> payment by the COUNTY . <br /> (m) Prepare and submit a Final Certification to FDEP . <br /> (n) Provide as -built drawings and a completed As-Built Certification form to the USACE with <br /> pre -Phase 2 construction aerial photographs (obtained via prior authorization as "post-Phase 1 <br /> construction controlled aerial photography " under WORK ORDER NUMBER 8 and post— <br /> Phase 2 construction aerial photographs (collected under Task 5 - if completed and available) <br /> per USACE Special Condition 9 . <br /> (o) Prepare and submit a letter to the agencies sulrunarizing the findings of items p and q in Task <br /> 2 above . <br /> (p) Under subcontract with M&E, perform "pay profile surveys" and determine actual quantities <br /> placed by the Contractor for acceptance of fill segments at a minimum segment length of <br /> 1 ,000 feet with pay profiles at a spacing of 100 feet; for Phase 2 a total of 138 "pay surveys" <br /> are required , for the uncompleted portion of Phase 1 a total of 21 "pay surveys" are required , <br /> for a the completed portions of Phase 1 to be "touched up" in conjunction with Phase 2 a total <br /> of 25 "pay surveys" are required ; a total of 184 "pay surveys" are planned to coincide with <br /> spot checks during construction. These surveys will be performed within two weeks prior to <br /> Page 3 of 8 <br /> October 4, 2010 <br /> Revised April 13, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.