Laserfiche WebLink
means, method , technique, sequence, or procedure of satisfactory evidence (including reports of required <br /> construction which is shown or indicated in and tests) as to the source, kind , and quality of materials <br /> expressly required by the Contract Documents . CON= and equipment. All materials and equipment shall be <br /> TRACTOR shall be responsible to see that the stored , applied , installed, connected , erected , <br /> completed Work complies accurately with the Contract protected , used , cleaned , and conditioned in <br /> Documents , accordance with instructions of the applicable <br /> Supplier, except as otherwise may be provided in the <br /> Be At all times during the progress of the Work, Contract Documents . <br /> CONTRACTOR shall assign a competent resident <br /> superintendent thereto who shall not be replaced 6 .04 Progress Schedule <br /> without written notice to OWNER and ENGINEER <br /> except under extraordinary circumstances . The A. CONTRACTOR shall adhere to the progress <br /> superintendent will be CONTRACTOR's schedule established in accordance with paragraph <br /> representative at the Site and shall have authority to 2 .07 as it may be adjusted from time to <br /> time as <br /> act on behalf of CONTRACTOR. All communications provided below. <br /> given to or received from the superintendent shall be <br /> binding on CONTRACTOR. 1 . CONTRACTOR shall submit to <br /> ENGINEER for acceptance (to the extent indi- <br /> 6 .02 Labor; Working Hours sated in paragraph 2 . 07) proposed adjustments <br /> in the progress schedule that will not result in <br /> A. CONTRACTOR shall provide competent, changing the Contract Times (or Milestones). <br /> suitably qualified personnel to survey, lay out, and Such adjustments will conform generally to the <br /> construct the Work as required by the Contract Docu- progress schedule then in effect and additional- <br /> ments . . . CONTRACTOR shall at all times maintain ly will comply with any provisions of the General <br /> good discipline and order at the Site. Requirements applicable thereto. <br /> Be Except as otherwise required for the safety or 2 . Proposed adjustments in the <br /> protection of persons or the Work or property at the progress schedule that will change the Contract <br /> Site or adjacent thereto, and except as otherwise Times (or Milestones) shall be submitted in <br /> stated in the Contract Documents, all Work at the Site accordance with the requirements of Article 12 . <br /> shall be performed during regular working hours , and Such adjustments may only be made by a <br /> CONTRACTOR will not permit overtime work or the Change Order or Written Amendment in accor- <br /> performance of Work on Saturday, Sunday, or any dance with Article 12 . <br /> legal holiday without OWNER's written consent (which <br /> will not be unreasonably withheld) given after prior 6 .05 Substitutes and "Or-Equals" <br /> written notice to ENGINEER. <br /> A. Whenever an item of material or equipment is <br /> specified or described in the Contract Documents by <br /> 6 .03 Services, Materials, and Equipment using the name of a proprietary item or the name of a <br /> particular Supplier, the specification or description is <br /> A. Unless otherwise specified in the General Re- intended to establish the type, function , appearance, <br /> quirements, CONTRACTOR shall provide and and quality required . Unless the specification or <br /> assume full responsibility for all services, materials , description contains or is followed by words <br />reading <br /> equipment, labor, transportation, construction that no like, equivalent, or "or-equal" item or no <br /> equipment and machinery, tools, appliances , fuel , substitution is permitted , other items of material or <br /> power, light, heat, telephone, water, sanitary facilities , equipment or material or equipment of other Suppliers <br /> temporary facilities, and all other facilities and may be submitted to ENGINEER for review under the <br /> incidentals necessary for the performance, testing, circumstances described below. <br /> start-up , and completion of the Work. <br /> 1 . "Or-Equal" Items: If in ENGINEER's <br /> Be All materials and equipment incorporated into sole discretion an item of material or equipment <br /> the Work shall be as specified or, if not specified , shall proposed by CONTRACTOR is functionally <br /> be of good quality and new, except as otherwise equal to that named and sufficiently similar so <br /> provided in the Contract Documents . All warranties that no change in related Work will be required, <br /> and guarantees specifically called for by the Specifica- it may be considered by ENGINEER as an <br /> tions shall expressly run to the benefit of OWNER. If "or-equal" item , in which case review and <br /> required by ENGINEER, CONTRACTOR shall furnish approval of the proposed item may, . in <br /> 00700 - General Conditions REV 04.07.doc <br /> 00700 - 19 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\1131 •IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927V\dmim\Contract Documents\00700 - General Conditions REV <br /> 04- <br /> 07.doc <br /> f <br />