Laserfiche WebLink
ENGINEER's sole discretion , be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substi- design , be similar in substance to that <br /> tute items . For the purposes of this paragraph specified , and be suited to the same use as <br /> 6 .05 .A. 1 , a proposed item of material or that specified . The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if: posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a. in the exercise of reasonable tial Completion on time, whether or not use <br /> judgment ENGINEER determines that: (i ) it of the proposed substitute item in the Work <br /> is at least equal in quality, durability, will require a change in any of the Contract <br /> appearance, strength , and design Documents (or in the provisions of any other <br /> characteristics; (ii) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole, and ; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is sub- <br /> b. CONTRACTOR certifies that: (i) ject to payment of any license fee or royalty, <br /> there is no increase in cost to the OWNER; All variations of the proposed substitute <br /> and (ii) it will conform substantially, even item from that specified will be identified <br /> in <br /> with deviations, to the detailed requirements the application , and available engineering , <br /> of the item named in the Contract sales, maintenance, repair, and <br /> Documents. replacement services will be indicated . The <br /> application will also contain an itemized esti- <br /> 2 . Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> a . If in ENGINEER's sole discretion an substitute item , including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change, all of which will be <br /> "or-equal" item under paragraph 6 .05.A. 11 it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item . ENGINEER may <br /> item . require CONTRACTOR to furnish additional <br /> data about the proposed substitute item . <br /> b . CONTRACTOR shall submit suffi- <br /> cient information as provided below to allow B . Substitute Construction Methods or Proce- <br /> ENGINEER to determine that the item of dures: If a specific means , method , technique, se- <br /> material or equipment proposed is quence, or procedure of construction is shown or <br /> essentially equivalent to that named and an indicated in and expressly required by the Contract <br /> acceptable substitute therefor. Requests for Documents, CONTRACTOR may furnish or utilize a <br /> review of proposed substitute items of substitute means, method , technique, sequence, or <br /> material or equipment will not be accepted procedure of construction approved by ENGINEER. <br /> by ENGINEER from anyone other than CONTRACTOR shall submit sufficient information to <br /> CONTRACTOR. allow ENGINEER, in ENGINEER's sole discretion , to <br /> determine that the substitute proposed is equivalent to <br /> c. The procedure for review by ENGI= that expressly called for by the Contract Documents . <br /> NEER will be as set forth in paragraph The procedure for review by ENGINEER will be similar <br /> 6 .05 .A.2 .d , as supplemented in the General to that provided in subparagraph 6 .05 .A.2. <br /> Requirements and as ENGINEER may <br /> decide is appropriate under the C . Engineer's Evaluation: ENGINEER will be <br /> circumstances . allowed a reasonable time within which to evaluate <br /> each proposal or submittal made pursuant to para- <br /> d . CONTRACTOR shall first make graphs 6 .05.A and 6.05. 8 . ENGINEER will be the <br /> written application to ENGINEER for review sole judge of acceptability. No "or-equal" or substitute <br /> of a proposed substitute item of material or will be ordered , installed or utilized until ENGINEER's <br /> equipment that CONTRACTOR seeks to review is complete, which will be evidenced by either a <br /> furnish or use . The application shall certify Change Order for a substitute or an approved Shop <br /> that the proposed substitute item will Drawing for an "or equal " ENGINEER will advise <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 20 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St•SEE PROJ 0927Wdmim\Contract Doaments\00700 - General Conditions <br /> REV 04- <br /> 07.doc <br />