Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a . the Work is defective, or completed pay CONTRACTOR the amount so withheld, or <br /> Work has been damaged , requiring any adjustment thereto agreed to by OWNER <br /> correction or replacement; and CONTRACTOR, when CONTRACTOR <br /> corrects to OWNER's satisfaction the reasons <br /> b . the Contract Price has been reduced for such action . <br /> by Written Amendment or Change Orders; <br /> 3 . If it is subsequently determined that <br /> c. OWNER has been required to correct OWNER's refusal of payment was not justified , <br /> defective Work or complete Work in actor- the amount wrongfully withheld shall be treated <br /> dance with paragraph 13 .09 , or as an amount due as determined by paragraph <br /> 14 .02 . C . 1 . <br /> d ENGINEER has anf„al knowledge i+F <br /> the OGG M WFSAGS of any of the events enumei; 14 .03 CONTRACTOR's Warranty of Title <br /> mom <br /> A. CONTRACTOR warrants and guarantees <br /> C . Payment Becomes Due that title to all Work, materials , and equipment covered <br /> by any Application for Payment, whether incorporated <br /> in the Project or not, will pass to OWNER no later than <br /> the time of payment free and clear of all Liens . <br /> F=NGINI==996 FennFr+ mendatieA , the AMOUR <br /> 14 .04 Substantial Completion <br /> due will be paid by QWN ' ACTOR A. When CONTRACTOR considers the entire <br /> Work ready for its intended use CONTRACTOR shall <br /> D. Reduction in Payment notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete (except for items <br /> 1 . OWNER may refuse to make specifically listed by CONTRACTOR as incomplete) <br /> payment of the full amount recommended by and request that ENGINEER issue a certificate of <br /> ENGINEER because : Substantial Completion . Promptly thereafter, <br /> OWNER, CONTRACTOR, and ENGINEER shall <br /> a . claims have been made against make an inspection of the Work to determine the <br /> OWNER on account of CONTRACTOR's status of completion . If ENGINEER does not consider <br /> performance or furnishing of the Work, the Work substantially complete, ENGINEER will <br /> notify CONTRACTOR in writing giving the reasons <br /> b . Liens have been filed in connection therefore . I mom <br /> with the Work, except where substAntoWly GGFRPISte, <br /> CONTRACTOR has delivered a specific <br /> Bond satisfactory to OWNER to secure the <br /> satisfaction and discharge of such Liens ; <br /> c. there are other items entitling OWN- <br /> ER to a set-off against the amount <br /> recommended ; or <br /> d . OWNER has actual knowledge of the , <br /> occurrence of any of the events enumerated , <br /> in paragraphs 14 .02 .B . 5.a through <br /> 14 .02 . B . 5 .c or paragraph 15 .02 .A. <br /> 2 . If OWNER refuses to make payment , <br /> of the full amount recommended by , <br /> ENGINEER, OWNER must give ENGIAICCG 91 within said dA day even„#e and <br /> CONTRACTOR immediate written notice (with <br /> a copy to ENGINEER) stating the reasons for <br /> such action and promptly pay CONTRACTOR <br /> any amount remaining after deduction of the <br /> amount so withheld . OWNER shall promptly as ENIGINEER believes justified after cani;;idamtea <br /> 00700 - General Conditions REV 04;07.doc <br /> 00700 - 40 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract Documents\00700 - General Conditions <br />REV 04- <br /> 07.doc <br />