My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determine its status of completion . If <br /> ENGINEER does not consider that part of the <br /> r=hrQIbIr=M will dt;lh _ . to OWNER <br /> and GQNTRAG Work to be substantially complete, ENGINEER <br /> WW <br /> will notify OWNER and CONTRACTOR in <br /> writing giving the reasons therefor. If <br /> ENGINEER considers that part of the Work to <br /> 9p9Fat99l; 1 safety, and pFete4en of the W9Fk1 be substantially complete, the provisions of <br /> ties , ' paragraph 14 .04 will apply with respect to <br /> certification of Substantial Completion of that <br /> part of the Work and the division of <br /> 1.,f. rm, F.WGIAI66I7 *R 1AW41nn PFOOF t9 ENGIAICCC'c. responsibility in respect thereof and access <br /> thereto. <br /> 2 . No occupancy or separate operation <br /> pagment. of part of the Work may occur prior to <br /> compliance with the requirements of paragraph <br /> B . OWNER shall have the right to exclude 5. 10 regarding property insurance . <br /> CONTRACTOR from the Site after the date of <br /> Substantial Completion , but OWNER shall allow CON- 14 .06 Final Inspection <br /> TRACTOR reasonable access to complete or correct <br /> items on the tentative list. A. Upon written notice from CONTRACTOR that <br /> the entire Work or an agreed portion thereof is <br /> 14.05 Partial Utilization complete, ENGINEER will promptly make a final <br /> inspection with OWNER and CONTRACTOR and will <br /> A. Use by OWNER at OWNER'S option of any notify CONTRACTOR in writing of all particulars in <br /> substantially completed part of the Work which has which this inspection reveals that the Work is <br /> specifically been identified in the Contract Documents, incomplete or defective. CONTRACTOR shall <br /> or which OWNER, ENGINEER, and CONTRACTOR immediately take such measures as are necessary to <br /> agree constitutes a separately functioning and usable complete such Work or remedy such deficiencies . <br /> part of the Work that can be used by OWNER for its <br /> intended purpose without significant interference with 14 . 07 Final Payment <br /> CONTRACTOR's performance of the remainder of <br /> the Work, may be accomplished prior to Substantial A. Application for Payment <br /> Completion of all the Work subject to the following <br /> conditions. 1 . After CONTRACTOR has , in the <br /> opinion of ENGINEER, satisfactorily completed <br /> 1 . OWNER at any time may request all corrections identified during the final <br /> CONTRACTOR in writing to permit OWNER to inspection and has delivered , in accordance <br /> use any such part of the Work which OWNER with the Contract Documents, all maintenance <br /> believes to be ready for its intended use and and operating instructions , schedules, guaran- <br /> substantially complete. If CONTRACTOR tees, Bonds, certificates or other evidence of <br /> agrees that such part of the Work is insurance certificates of inspection , marked-up <br /> substantially complete, CONTRACTOR will record documents (as provided in paragraph <br /> certify to OWNER and ENGINEER that such 6 . 12), and other documents , CONTRACTOR <br /> part of the Work is substantially complete and may make application for final payment follow- <br /> request ENGINEER to issue a certificate of ing the procedure for progress payments . <br /> Substantial Completion for that part of the <br /> Work. CONTRACTOR at any time may notify 2 . The final Application for Payment <br /> OWNER and ENGINEER in writing that shall be accompanied (except as previously <br /> CONTRACTOR considers any such part of the delivered) by: (i) all documentation called for in <br /> Work ready for its intended use and substan- the Contract Documents , including but not <br /> tially complete and request ENGINEER to issue limited to the evidence of insurance required by <br /> a certificate of Substantial Completion for that subparagraph 5 .04 . 6 . 7; (ii) consent of the <br /> part of the Work . Within a reasonable time surety, if any, to final payment; and (iii) <br /> after either such request, OWNER, complete and legally effective releases or <br /> CONTRACTOR, and ENGINEER shall make waivers (satisfactory to OWNER) of all Lien <br /> an inspection of that part of the Work to <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 41 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927V\dmim\Contract Documents\00700 - General Conditions REV <br />04- <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.