Laserfiche WebLink
emergency upon specific permission of the ENGINEER . <br /> SC =Ulla Concerning Subcontractors , .Suppliers, and Others , <br /> SC-6. 06. C . Add the following sentence at the end of paragraph GC406. C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity , to the extent practicable, information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity. <br /> SC-6. 08 Permits <br /> SC-6 . 08 Add the following paragraphs immediately after paragraph GC-6. 08. A: <br /> 1 . The OWNER has obtained the following permits (copies of these permits are <br /> contained in Appendix "A" ) : <br /> 2 . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> 3. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC -13. 03 Test and Inspections <br /> SC- 13 . 03 . 13 . Delete paragraph GG13. 03. 8 in its entirety, and insert the following sentences in <br /> its place: <br /> Be OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections , tests, or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below. Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment . The CONTRACTOR shall arrange, obtain , and pay for the <br /> following inspections , tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03. 0 and 13 . 03 . D <br /> below; <br /> 2s costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04. 13 ; <br /> 3a tests otherwise specifically provided in the Contract Documents . <br /> 13.05 OWNER May Stop the Work <br /> SCA 3 . 05 .A. Delete paragraph GC43. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> 00800-6 <br /> 00800 = Supplementary Conditions 06-09 rev.doc <br /> 00800 6FAPublic WorkMENGINEERING DIVISION PROJECTSM31 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927%AdmimlContract Documents100800 - <br /> I <br />