My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
emergency upon specific permission of the ENGINEER . <br /> SC =Ulla Concerning Subcontractors , .Suppliers, and Others , <br /> SC-6. 06. C . Add the following sentence at the end of paragraph GC406. C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity , to the extent practicable, information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity. <br /> SC-6. 08 Permits <br /> SC-6 . 08 Add the following paragraphs immediately after paragraph GC-6. 08. A: <br /> 1 . The OWNER has obtained the following permits (copies of these permits are <br /> contained in Appendix "A" ) : <br /> 2 . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> 3. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC -13. 03 Test and Inspections <br /> SC- 13 . 03 . 13 . Delete paragraph GG13. 03. 8 in its entirety, and insert the following sentences in <br /> its place: <br /> Be OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections , tests, or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below. Subsequent <br /> inspections , tests , or approvals required after initial failing inspections , tests , or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment . The CONTRACTOR shall arrange, obtain , and pay for the <br /> following inspections , tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03. 0 and 13 . 03 . D <br /> below; <br /> 2s costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04. 13 ; <br /> 3a tests otherwise specifically provided in the Contract Documents . <br /> 13.05 OWNER May Stop the Work <br /> SCA 3 . 05 .A. Delete paragraph GC43. 05.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> 00800-6 <br /> 00800 = Supplementary Conditions 06-09 rev.doc <br /> 00800 6FAPublic WorkMENGINEERING DIVISION PROJECTSM31 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927%AdmimlContract Documents100800 - <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.