Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> OWNER to exercise this right for the benefit of CONTRACTOR, any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them. <br /> 14.02 Progress Payments <br /> SC- 14. 02 . B . 5 . Delete paragraph GC44. 02. B. 5. d in its entirety and insert the following paragraph <br /> in its place. <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 . 02 .A; or <br /> SCA4. 02 . B . 5 . Add the following sentences at the end of paragraph GC- 14. 02. 6. 5: <br /> e. OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing inspections , <br /> tests , or approvals . <br /> SC- 14. 02 . C . 1 . Delete paragraph GC44. 02. C. 1 in its entirety and insert the following <br /> paragraph in its place. <br /> Co Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act. F. S . 218 . 70 et. seq . <br /> SCA4 . 04A. After the third sentence in paragraph GC44. 04A of the General Conditions, <br /> delete the remainder of paragraph 14. 04A in its entirety and replace with the following: <br /> " if Engineer considers the Work substantially complete , Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion . In accordance with the provisions of Florida <br /> Statutes section 208 . 735 (7) (a)(2005) , upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete , <br /> satisfactory, and acceptable under this Agreement ( herein the "Statutory List") . <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion . The Owner and Contractor <br /> acknowledge and agree that: 1 ) the failure to include any corrective work , or <br /> pending items that are not yet completed , on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement; <br /> 2) upon completion of all items on the Statutory List , the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement; and 3 ) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> 008004 <br /> 00800 = Supplementary conditions 06-09 rev.doc <br /> 00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract Documents\00800 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.