My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
obligation of the Contractor to complete to the Owner's satisfaction under this <br /> Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project. " <br /> SC- 14 . 04B Add the following new paragraph immediately after paragraph GC 14. 048: <br /> C . At the time of delivery of the tentative certificate of Substantial Completion , Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> pending final payment between Owner and Contractor with respect to security, operation , <br /> safety, and protection of the Work , maintenance , heat, utilities , insurance , and warranties and <br /> guarantees <br /> SC -14.07 Final Payment <br /> SCA4 . 07 . C. 1 . Delete paragraph GG14. 07. C. 1 in its entirety and insert the following <br /> paragraph in its place: <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" , Florida Statutes section 218 . 70 , et. seq . <br /> SC -15. 01 OWNER May Suspend Work <br /> SCA 5 . 01 .A Delete the last sentence in paragraph GG15. 01 .A and insert the following in its <br /> place: <br /> CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br /> such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br /> 10 . 05 . CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br /> CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br /> nomic loss arising out of or resulting from such Work suspension . <br /> SC -15.02 OWNER May Terminate For Cause <br /> SC= 15 . 02 .A. 5 and SC- 15 . 02 .A. 6 Add the following new paragraphs immediately after <br /> paragraph GC45. 02.A. 4: <br /> 5 . CONTRACTOR's violation of Section 02225 — " Erosion Control and Treatment of <br /> Dewatering Water From the Construction Site. " <br /> 6 . CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br /> materials or labor in accordance with the respective agreements between the <br /> CONTRACTOR and the Subcontractors or Suppliers . <br /> SC-15.04 CONTRACTOR May Stop Work or Terminate <br /> SC- 15 . 04 Delete the following text from the first sentence of paragraph GG15. 04.A: <br /> SC- 15 . 04 Delete the following text from the second sentence of paragraph GC45. 04.A: <br /> 00800-8 <br /> 00800 - Supplementary Conditions 06-09 rev.doc <br /> 00800 8FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927WIrnim\Contract Documents\00800 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.