Laserfiche WebLink
procedures and policies described therein shall in no way act as a waiver of any of the <br /> terms of the liability of the Contractor or his surety. <br /> F . Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic on <br /> Indian River Boulevard at all times . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> SECTION - 104 - EROSION CONTROL AND TREATMENT OF DEWATERING WATER <br /> AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water and stormwater <br /> runoff from the construction site and work area . The pollution control measures shall <br /> prevent turbid or otherwise polluted waters from being discharged from . the construction <br /> site or work area , to undeveloped portions of the site or off-site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense . The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project' s construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during any <br /> phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control" of the Florida Erosion and Sediment <br /> Control Inspector's Manual , and other references as may be required by regulatory <br /> permits . (http ://www. dep . state . fl . us ./water/nonpoint/docs/erosion/erosion-inspectors- <br /> manual . pdo <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively, thffi e OWNER may halt the CONTRACTOR's operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR's work as a result of its failure to comply with this Section , the Construction <br /> Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 - " Best Management Practices <br /> 010254 Technical Specifications <br /> C•�oihlln \n/nr4c\PAIrDINPFRIN(: f11\/LCI(1N PRr), IPRTC\1131 _IR Rlvrl RAmirfartinn A1at At to 53rd St-SEE PRO.] 092AAdmim\Contract <br />