My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices for <br /> Dewatering " of the Florida Erosion and Sediment Control Inspector' s Manual . In the event <br /> of a conflict between the referenced Chapters and these Specifications , the more stringent <br /> requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A. The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of the <br /> Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay for all <br /> other required permits , licenses , sampling , and tests . Permits the CONTRACTOR may <br /> need to secure may include but not be limited to : <br /> 1 . Long -term and/or short-term dewatering permit as required by the St. Johns <br /> River Water Management District (SJRWMD) . Generally, only the short-term <br /> permit is required . Contact SJRWMD at (321 ) 9844940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> 2 . SJRWMD RDS-50 Permit (required ) ; <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities (required ) . Contact the Florida Department <br /> of Environmental Protection ( FDEP) at (866) 336-6312 (toll free) or (850) <br /> 245-7522 or www, dep . state . fl . us/water/stormwater/npdes/ <br /> 4 . FDEP' s Uncontaminated Groundwater Release Permit ( required if <br /> dewatering occurs) . This permit requires water quality testing by a State <br /> certified laboratory. <br /> Be Provide copies of all permits to the OWNER and ENGINEER and comply with all conditions <br /> contained in all permits at no extra cost to the OWNER . If there is a conflict between any <br /> permit requirement and these Specifications , the more stringent specification or <br /> requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water quality <br /> sampling and laboratory tests required by any permit. <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans and permits and <br /> approved for use by the OWNER and applicable permitting authorities . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution control <br /> and treatment system is properly constructed or repaired , and complies with the <br /> approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the construction <br /> site . Implement erosion control measures on disturbed areas as soon as practicable in <br /> 01025-5 Technicai Specifications <br /> � . e�. .a.r.. MI..A.&% I=Klf_. IKICCGIAIr2 r1I%/IC Ink] DRn IC7rTRN 141 .IR Mid RAmirfarinn AIM Rt to SAM Rt SEE PROJ 0927\Admim\Contract <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.