Laserfiche WebLink
for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices for <br /> Dewatering " of the Florida Erosion and Sediment Control Inspector' s Manual . In the event <br /> of a conflict between the referenced Chapters and these Specifications , the more stringent <br /> requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A. The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph SC-6 . 08 of the Supplementary Conditions . Per paragraph SC-6 . 08 . 0 of the <br /> Supplementary Conditions , the CONTRACTOR shall apply for, obtain , and pay for all <br /> other required permits , licenses , sampling , and tests . Permits the CONTRACTOR may <br /> need to secure may include but not be limited to : <br /> 1 . Long -term and/or short-term dewatering permit as required by the St. Johns <br /> River Water Management District (SJRWMD) . Generally, only the short-term <br /> permit is required . Contact SJRWMD at (321 ) 9844940 to determine which <br /> permit is required and the associated statutory requirements ; <br /> 2 . SJRWMD RDS-50 Permit (required ) ; <br /> 3 . The State of Florida Generic Permit for Stormwater Discharge From Large <br /> and Small Construction Activities (required ) . Contact the Florida Department <br /> of Environmental Protection ( FDEP) at (866) 336-6312 (toll free) or (850) <br /> 245-7522 or www, dep . state . fl . us/water/stormwater/npdes/ <br /> 4 . FDEP' s Uncontaminated Groundwater Release Permit ( required if <br /> dewatering occurs) . This permit requires water quality testing by a State <br /> certified laboratory. <br /> Be Provide copies of all permits to the OWNER and ENGINEER and comply with all conditions <br /> contained in all permits at no extra cost to the OWNER . If there is a conflict between any <br /> permit requirement and these Specifications , the more stringent specification or <br /> requirement shall govern . <br /> C . In addition to paying for all permit fees , CONTRACTOR shall also pay for all water quality <br /> sampling and laboratory tests required by any permit. <br /> 1 . 3 GENERAL <br /> A . Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans and permits and <br /> approved for use by the OWNER and applicable permitting authorities . <br /> Be From time to time , the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER . If at any time , the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system , the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance , and it shall remain shut-down until the pollution control <br /> and treatment system is properly constructed or repaired , and complies with the <br /> approved pollution control and treatment system plans and specifications . <br /> C . Schedule construction to minimize erosion and stormwater runoff from the construction <br /> site . Implement erosion control measures on disturbed areas as soon as practicable in <br /> 01025-5 Technicai Specifications <br /> � . e�. .a.r.. MI..A.&% I=Klf_. IKICCGIAIr2 r1I%/IC Ink] DRn IC7rTRN 141 .IR Mid RAmirfarinn AIM Rt to SAM Rt SEE PROJ 0927\Admim\Contract <br /> I <br />