Laserfiche WebLink
portions of the site where construction activities have temporarily or permanently <br /> ceased , but in no case more than 7 days after the construction activity in that portion of <br /> the site has temporarily or permanently ceased . In addition to other temporary erosion <br /> control measures that may be implemented , application of polyacrylamide is required <br /> on all such disturbed areas within 7 days after the construction activity in that portion of <br /> the site has temporarily or permanently ceased , unless final landscaping has been <br /> installed . Polyacrylamide application shall be as specified herein . <br /> D . Inspect each pollution control system at least once per day and after each rainfall <br /> event . Clean and maintain each pollution control system as required by its <br /> manufacturer or the OWNER , . until the system is no longer needed . If a water quality <br /> violation occurs , immediately cease all work contributing to the water quality violation <br /> and correct the problem . <br /> E . Discharge shall not violate State or local water quality standards in the receiving <br /> waters , nor cause injury to the public health or to public or private property, nor to the <br /> Work completed or in progress . The receiving point for water from construction <br /> operations shall be approved by the applicable owner, regulatory agency, and the <br /> ENGINEER . <br /> F . Promptly repair all damage at no cost to the OWNER . <br /> 1 .4 SUBMITTALS <br /> A. Shop Drawings : Submit shop drawings of the proposed pollution control and treatment <br /> systems in accordance with Section 1340 . <br /> B . Stormwater Pollution Prevention Plan , <br /> 1 . 5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br /> REQUIRED FOR INSTALLATION AND MAINTENANCE <br /> A . State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br /> Maintenance : Installation and maintenance of all erosion and stormwater pollution <br /> control devices , shall be by a State Certified erosion control subcontractor who <br /> specializes in the installation and maintenance of such devices . After installation , this <br /> specialty subcontractor shall maintain the erosion and stormwater pollution control <br /> devices until in the ENGINEER 's sole opinion , the devices are no longer necessary <br /> (such time not to extend past the date the OWNER formally accepts the project as <br /> complete) . Before beginning construction , submit to Indian River County for review <br /> and approval , a Stormwater Pollution Prevention Plan (SWPPP) , prepared by the <br /> certified erosion control subcontractor . Construction shall not begin until the SWPPP <br /> has been approved by Indian River County. Submit the approved SWPPP to the <br /> ENGINEER before beginning construction . Include in the SWPPP , the "Contractor's <br /> Affidavit Regarding Erosion Control and Treatment of Dewatering Water and <br /> Stormwater From the Construction Site" (located at the end of this Section) . <br /> 01025-6 Technical Specifications <br /> Po% D# ihIIr %A/nrkc%P:NrlIAIFFRINl: 111VI.CION PPO. IFrTgXl l � l _IR Rlvrl Raciufarinn dlct Rt to .5lyd St-SEE PROJ 0927V1dmim\Contract <br /> i _ <br />