Laserfiche WebLink
SECTION 00520 - Agreement ( Public Works ) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , ( hereinafter called <br /> OWNER) <br /> and CDn-� mr� n � f A, s� l� al � Gb �l� • <br /> (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 - WORK <br /> 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents . The Work is generally described as follows : <br /> The proposed improvements to Indian River Boulevard consist of resurfacing <br /> both northbound and southbound lanes from 41st Street to 53rd Street (approximately <br /> 8400 linear feet) . Also included with the project is signing and marking of the proposed <br /> resurfaced lanes . <br /> ARTICLE 2 - THE PROJECT <br /> 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> Project Name : Indian River Boulevard Resurfacing (41st Street to 53rd Street) <br /> County Project Number: 1131 <br /> Bid Number: 2013007 <br /> Project Address : Indian River Boulevard , Indian River County , Florida <br /> ARTICLE 3 — ENGINEER <br /> 3 . 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative , assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents . <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4 . 01 Time of the Essence <br /> A . All time limits for Milestones , if any , Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract . <br /> 4 . 02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 60h day after the date when the <br /> Contract Times commence to run as provided in paragraph 2 . 03 of the General <br /> Conditions , and completed and ready for final pa ment in accordance with paragraph <br /> 14 . 07 of the General Conditions on or before the 7e day after the date when the Contract <br /> Times commence to run . <br /> 00520 - Agreement (Public Works) REV 04-07 (7) <br /> 00520 - 2 <br /> I <br />