My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 = Certificate of Substantial Completion <br /> Date of Issuance : 20 <br /> OWNER : Indian River County <br /> CONTRACTOR : <br /> Project: Indian River Boulevard Resurfacing (41st Street to 53d Street) . <br /> Bid No . 2013007 <br /> ENGINEER's Project No . 1131 <br /> CONTRACT FOR : Indian River Boulevard _Resurfacing (41st Street to 53rd Street) , <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> Too <br /> OWNER <br /> And To <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of <br /> OWNER , CONTRACTOR and ENGINEER , and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto . This list may not be all- <br /> inclusive , and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents . The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within days <br /> of the above date of Substantial Completion . <br /> 00630 - Certificate of Substantial Completion REV 0407.doc <br /> 00630 - 1 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTSN 131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract DocumentsWMO - Certificate of <br /> Substantial Completion REV 0"Tdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.