Laserfiche WebLink
The responsibilities between OWNER and CONTRACTOR for security, operation , safety, <br /> maintenance , heat , utilities , insurance and warranties and guarantees shall be as follows : <br /> OWNER: <br /> CONTRACTOR: <br /> The following documents are attached to and made a part of this Certificate . <br /> [For items to be attached see definition of Substantial Completion as supplemented and other specifically <br /> noted conditions precedent to achieving Substantial Completion as required by Contract Documents.] <br /> This certificate does not constitute an acceptance of Work not in accordance with the Contract <br /> Documents nor is it a release of CONTRACTOR's obligation to complete the Work in <br /> accordance with the Contract Documents . <br /> Executed by ENGINEER on . ( Date) . <br /> ENGINEER: <br /> By: <br /> (Authorized Signature) <br /> CONTRACTOR accepts this Certificate of Substantial Completion on (date) . <br /> CONTRACTOR : <br /> By : <br /> (Authorized Signature) <br /> OWNER accepts this Certificate of Substantial Completion on (date) . <br /> OWNER : INDIAN RIVER COUNTY <br /> By: <br /> (Authorized Signature) <br /> * * END OF SECTION <br /> 00630 - Certificate of Substantial Completion REV 04-07 .doc <br /> 00630 - 2 <br /> FAPublic WorksXENGINEERING MISION PROJECTSN 131 -IR Blvd Resurfacing 41st St to 53rd StSEE PROJ 0927Wdmim\Contract Documents\00630 - Certificate of <br /> Substantial Completion REV 04-07.doc <br />