Laserfiche WebLink
17 . Drawings--That part of the Contract 27 . Milestone—A principal event specified in <br /> Documents prepared or approved by ENGINEER the Contract Documents relating to an intermediate <br /> which graphically shows the scope, extent, and completion date or time prior to Substantial Comple- <br /> character of the Work to be performed by tion of all the Work. <br /> CONTRACTOR, Shop Drawings and other <br /> CONTRACTOR submittals are not Drawings as so 28. Notice of Award—The written notice by <br /> defined . OWNER to the apparent successful bidder stating that <br /> upon timely compliance by the apparent successful <br /> 18 . Effective Date of the Agreement—The bidder with the conditions precedent listed therein , <br /> date indicated in the Agreement on which it becomes OWNER will sign and deliver the Agreement. <br /> effective, but if no such date is indicated , it means the <br /> date on which the Agreement is signed and delivered 29. Notice to Proceed- A written notice given <br /> by the last of the two parties to sign and deliver. by OWNER to CONTRACTOR fixing the date on <br /> which the Contract Times will commence to run and <br /> 19. ENGINEER--The individual or entity on which CONTRACTOR shall start to perform the <br /> named as such in the Agreement. Work under the Contract Documents . <br /> ' 30 . OWNER—The individual , entity, public <br /> entity having a contract with ENGINEE 'hu <br /> body, or authority with whom CONTRACTOR has <br /> services as ENGINEER's onopend6i6t professional entered into the Agreement and for whom the Work is <br /> associate or consul respect to the Project and to be performed , <br /> who is ' ed as such in the Supplementary <br /> 31 , Partial Utilization—Use by OWNER of a <br /> substantially completed part of the Work for the pur- . <br /> 21 . Field Order—A written order issued by pose for which it is intended (or a related purpose) <br /> ENGINEER which requires minor changes in the prior to Substantial Completion of all the Work. <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times . 32 . PCBs—Polychlorinated biphenyls . <br /> 22 . General Requirements--Sections of 33 . Petroleum—Petroleum , including crude oil <br /> Division 1 of the Specifications. The General or any fraction thereof which is liquid at standard <br /> Requirements pertain to all sections of the Specifica- conditions of temperature and pressure (60 degrees <br /> tions . Fahrenheit and 14 .7 pounds per square inch <br /> absolute), such as oil , petroleum , fuel oil , oil sludge, oil <br /> 23. Hazardous Environmental Condition—The refuse, gasoline, kerosene, and oil mixed with other <br /> . presence at the Site of Asbestos , PCBs, Petroleum , non-Hazardous Waste and crude oils . <br /> Hazardous Waste, or Radioactive Material in such <br /> quantities or circumstances that may present a 34 . Project—The total construction of which <br /> substantial danger to persons or property exposed the Work to be performed under the Contract <br /> thereto in connection with the Work. Documents may be the whole, or a part as may be <br /> indicated elsewhere in the Contract Documents . <br /> 24 . Hazardous Waste—The term Hazardous <br /> Waste shall have the meaning provided in Section 35. Project Manual The bound documentary <br /> 1004 of the Solid Waste Disposal Act (42 USC information prepared for bidding and constructing the <br /> Section 6903) as amended from time to time. Work. A listing of the contents of the Project Manual , <br /> which may be bound in one or more volumes , is <br /> 25. Laws and Regulations; Laws or Regulat- contained in the table(s) of contents. <br /> ions--Any and all applicable laws, rules , regulations , <br /> ordinances, codes, and orders of any and all govern- 36 . Radioactive Material--Source, special <br /> mental bodies , agencies, authorities, and courts nuclear, or byproduct material as defined by the <br /> having jurisdiction . Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> seq . ) as amended from time to time. <br /> 26 . Liens--Charges, security interests, or <br /> encumbrances upon Project funds, real property, or 37 . Resident Project Representative--The <br /> personal property. authorized representative of ENGINEER who may be <br /> assigned to the Site or any part thereof. <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 6 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 •IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927VAdmim\Contract Docunrents\00700 - General Conditions <br />REV 04- <br /> 07.doc <br />