My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 . Drawings--That part of the Contract 27 . Milestone—A principal event specified in <br /> Documents prepared or approved by ENGINEER the Contract Documents relating to an intermediate <br /> which graphically shows the scope, extent, and completion date or time prior to Substantial Comple- <br /> character of the Work to be performed by tion of all the Work. <br /> CONTRACTOR, Shop Drawings and other <br /> CONTRACTOR submittals are not Drawings as so 28. Notice of Award—The written notice by <br /> defined . OWNER to the apparent successful bidder stating that <br /> upon timely compliance by the apparent successful <br /> 18 . Effective Date of the Agreement—The bidder with the conditions precedent listed therein , <br /> date indicated in the Agreement on which it becomes OWNER will sign and deliver the Agreement. <br /> effective, but if no such date is indicated , it means the <br /> date on which the Agreement is signed and delivered 29. Notice to Proceed- A written notice given <br /> by the last of the two parties to sign and deliver. by OWNER to CONTRACTOR fixing the date on <br /> which the Contract Times will commence to run and <br /> 19. ENGINEER--The individual or entity on which CONTRACTOR shall start to perform the <br /> named as such in the Agreement. Work under the Contract Documents . <br /> ' 30 . OWNER—The individual , entity, public <br /> entity having a contract with ENGINEE 'hu <br /> body, or authority with whom CONTRACTOR has <br /> services as ENGINEER's onopend6i6t professional entered into the Agreement and for whom the Work is <br /> associate or consul respect to the Project and to be performed , <br /> who is ' ed as such in the Supplementary <br /> 31 , Partial Utilization—Use by OWNER of a <br /> substantially completed part of the Work for the pur- . <br /> 21 . Field Order—A written order issued by pose for which it is intended (or a related purpose) <br /> ENGINEER which requires minor changes in the prior to Substantial Completion of all the Work. <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times . 32 . PCBs—Polychlorinated biphenyls . <br /> 22 . General Requirements--Sections of 33 . Petroleum—Petroleum , including crude oil <br /> Division 1 of the Specifications. The General or any fraction thereof which is liquid at standard <br /> Requirements pertain to all sections of the Specifica- conditions of temperature and pressure (60 degrees <br /> tions . Fahrenheit and 14 .7 pounds per square inch <br /> absolute), such as oil , petroleum , fuel oil , oil sludge, oil <br /> 23. Hazardous Environmental Condition—The refuse, gasoline, kerosene, and oil mixed with other <br /> . presence at the Site of Asbestos , PCBs, Petroleum , non-Hazardous Waste and crude oils . <br /> Hazardous Waste, or Radioactive Material in such <br /> quantities or circumstances that may present a 34 . Project—The total construction of which <br /> substantial danger to persons or property exposed the Work to be performed under the Contract <br /> thereto in connection with the Work. Documents may be the whole, or a part as may be <br /> indicated elsewhere in the Contract Documents . <br /> 24 . Hazardous Waste—The term Hazardous <br /> Waste shall have the meaning provided in Section 35. Project Manual The bound documentary <br /> 1004 of the Solid Waste Disposal Act (42 USC information prepared for bidding and constructing the <br /> Section 6903) as amended from time to time. Work. A listing of the contents of the Project Manual , <br /> which may be bound in one or more volumes , is <br /> 25. Laws and Regulations; Laws or Regulat- contained in the table(s) of contents. <br /> ions--Any and all applicable laws, rules , regulations , <br /> ordinances, codes, and orders of any and all govern- 36 . Radioactive Material--Source, special <br /> mental bodies , agencies, authorities, and courts nuclear, or byproduct material as defined by the <br /> having jurisdiction . Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> seq . ) as amended from time to time. <br /> 26 . Liens--Charges, security interests, or <br /> encumbrances upon Project funds, real property, or 37 . Resident Project Representative--The <br /> personal property. authorized representative of ENGINEER who may be <br /> assigned to the Site or any part thereof. <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 6 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 •IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927VAdmim\Contract Docunrents\00700 - General Conditions <br />REV 04- <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.