Laserfiche WebLink
38 . Samples—Physical examples of steam , liquid petroleum products, telephone or other <br /> materials , equipment, or workmanship that are communications , cable television , water, wastewater, <br /> representative of some portion of the Work and which storm water, other liquids or chemicals , or traffic or <br /> establish the standards by which such portion of the other control systems . <br /> Work will be judged . <br /> 47 . Unit Price Work—Work to be paid for on <br /> 39. Shop Drawings—All drawings , diagrams , the basis of unit prices , <br /> illustrations , schedules , and other data or information <br /> which are specifically prepared or assembled by or for 48 . Work—The entire completed construction <br /> CONTRACTOR and submitted by CONTRACTOR to or the various separately identifiable parts thereof re- <br /> illustrate some portion of the Work. quired to be provided under the Contract Documents . <br /> Work includes and is the result of performing or <br /> 40 . Site—Lands or areas indicated in the providing all labor, services, and documentation <br /> Contract Documents as being furnished by OWNER necessary to produce such construction, and <br /> upon which the Work is to be performed , including furnishing , installing , and incorporating all materials <br /> rights-of--way and easements for access thereto, and and equipment into such construction , all as required <br /> such other lands furnished by OWNER which are by the Contract Documents . <br /> designated for the use of CONTRACTOR. <br /> 49 . Work Change Directive—A written <br /> 41 . Specification- That part of the Contract statement to CONTRACTOR issued on or after the <br /> Documents consisting of written technical descriptions Effective Date of the Agreement and signed by <br /> of materials , equipment, systems , standards, and OWNER and recommended by ENGINEER ordering <br /> workmanship as applied to the Work and certain an addition , deletion , or revision in the Work, or <br /> administrative details applicable thereto . responding to differing or unforeseen subsurface or <br /> physical conditions under which the Work is to be <br /> 42 . Subcontractor—An individual or entity performed or to emergencies . A Work Change <br /> having a direct contract with CONTRACTOR or with Directive will not change the Contract Price or <br />the <br /> any other Subcontractor for the performance of a part Contract Times but is evidence that the parties expect <br /> of the Work at the Site . that the change ordered or documented by a Work <br /> Change Directive will be incorporated in a subse- <br /> 43. Substantial Completion—The time at quently issued Change Order following negotiations by <br /> which the Work (or a specified part thereof) has the parties as to its effect, if any, on the Contract Price <br /> progressed to the point where, in the opinion of or Contract Times. <br /> ENGINEER, the Work (or a specified part thereof) is <br /> sufficiently complete, in accordance with the Contract 50 . Written Amendment A written statement <br /> Documents, so that the Work (or a specified part modifying the Contract Documents, signed by <br /> thereof) can be utilized for the purposes for which it is OWNER and CONTRACTOR on or after the Effective <br /> intended . The terms "substantially complete" and Date of the Agreement and normally dealing with the <br /> "substantially completed" as applied to all or part of the nonengineering or nontechnical rather than strictly <br /> Work refer to Substantial Completion thereof. construction-related aspects of the Contract Docu- <br /> ments . <br /> 44 . Supplementary Conditions—That part of <br /> the Contract Documents which amends or 1 .02 Terminology <br /> supplements these General Conditions . <br /> A. Intent of Certain Terms or Adjectives <br /> 45. Supplier—A manufacturer, fabricator, <br /> supplier, distributor, matenalman , or vendor having a 1 . Whenever in the Contract Documents the <br /> direct contract with CONTRACTOR or with any terms "as allowed ," "as approved ," or terms of like <br /> Subcontractor to furnish materials or equipment to be effect or import are used , or the adjectives <br /> incorporated in the Work by CONTRACTOR or any "reasonable," "suitable," "acceptable," "proper, " <br /> Subcontractor. "satisfactory," or adjectives of like effect or import <br /> are used to describe an action or determination of <br /> 46 . Underground Facilities- All underground ENGINEER as to the Work, it is intended that such <br /> pipelines, conduits , ducts , cables , wires , manholes, action or determination will be solely to evaluate, in <br /> vaults, tanks, tunnels, or other such facilities or general , the completed Work for compliance with <br /> attachments , and any encasements containing such the requirements of and information in the Contract <br /> facilities, including those that convey electricity, gases , Documents and conformance with the design <br /> 00700 = General Conditions REV 04-07.doc <br /> 00700 - 7 <br /> F:\Public WorksAENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41 st St to 53rd St-SEE PROJ 0927Wdmtm\Contract Documents\00700 - General Conditions <br /> REV 04- <br /> 07.doc <br />