My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concept of the completed Project as a functioning 4 . When "furnish , " "install , " " perform , " or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context . clearly <br /> indicating otherwise). The use of any such term or requiring an obligation of CONTRACTOR , <br /> adjective shall not be effective to assign to ENGI- " provide" is implied . <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9. 10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning . <br /> B. Day <br /> 1 . The word "day" shall constitute a ARTICLE 2 - PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2 .01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the , executed <br /> 1 . The word "defective, " when modifying Agreements to OWNER , CONTRACTOR shall also <br /> the word "Work, " refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish , <br /> not conform to the Contract Documents or does <br /> not , .meet the requirements of any inspection , 2002 Copies of Documents <br /> reference standard , test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> mendation of final payment (unless responsions copies will be furnished upon request at the cost of <br /> bility for the protection thereof has been reproduction . <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2 . 03 Commencement of Contract Times; Notice <br /> 14. 04 or 14. 05) . to Proceed <br /> D . Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1 . , " when 11sed in ment or, if a Notice to Proceed is given , on the day <br /> i4ww , mategals, 9 indicated in the Notice to Proceed . A Notice to Pro- <br /> , teed may be given at any time within 30 days after the <br /> said seworses, mategalS, OF equip nt to the Effective Date of the Agreement. In no event will the <br /> Contract Times commence to run later than the <br /> ninetieth day after the day of Bid opening or the <br /> ser3dit thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> 2 . IMOF(i " Install , " when used in <br /> ww <br /> 2 . 04 Starting the Work <br /> , mate0als, e A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com- <br /> uses mence to run . No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 30 The weFds u n u n <br /> eF , run . <br /> when used in GGRAeGtOOR With 68NIG861 <br /> 2 . 05 Before Starting Construction <br /> A. CONTRACTOR's Review of Contract Docu- <br /> �se ments: Before undertaking each part of the Work, <br /> CONTRACTOR shall carefully study and compare the <br /> 00700 - General Conditions REV 0"7.doc <br /> 00700 - 8 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1131 -IR Blvd Resurfacing 41st St to 53rd St-SEE PROJ 0927Wdmim\Contract DocumeMs\00700 - General Conditions REV <br />04 <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.