My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-211A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:22:34 AM
Creation date
10/1/2015 4:56:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/04/2012
Control Number
2012-211A
Agenda Item Number
8.F.
Entity Name
Community Asphalt Corp.
Subject
Contract and Specifications
Indian River Boulevard Resurfacing
Area
Indian River Blvd. 41st. St. to 53rd. St.
Project Number
1131
Bid Number
2013007
Supplemental fields
SmeadsoftID
11670
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent wei:kinq undeFiStanding ameng the parties as to the <br /> figures therein and all applicable field measurements. Work and to discuss the schedules o in para- <br /> CONTRACTOR shall promptly report in writing to graph 2 . 05. 13 , proced andling Shop Drawings <br /> ENGINEER any conflict, error, ambiguity, or and oth i tals, processing Applications for <br /> discrepancy which CONTRACTOR may discover and . <br /> shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected 2007 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A. Unless otherwise provided in the Contract <br /> conflict, error, ambiguity, or discrepancy in the Documents, at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof. CONTRACTOR , ENGINEER , and others as appropri- <br /> ate will be held to review for acceptability to ENGI- <br /> B. Preliminary Schedules: Within ten days after NEER as provided below the schedules submitted in <br /> the Effective Date of the Agreement ( unless otherwise accordance with paragraph 2 . 05. 6. CONTRACTOR <br /> specified in the General Requirements) , CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review: and adjustments and to complete and resubmit the <br /> schedules. No progress payment shall be made to <br /> 1 . a preliminary progress schedule CONTRACTOR until acceptable schedules are <br /> indicating the times (numbers of days or dates) submitted to ENGINEER. <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1 . The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 2* a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times. Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> mitting , reviewing , and processing such progress schedule, for sequencing , scheduling , <br /> submittal; and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from CONTRACTOR's <br /> 30 a preliminary schedule of values for full responsibility therefor, <br /> all of the Work which includes quantities and <br /> prices of items which when added together 2 . CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals, <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work. 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> and substance if it provides a reasonable <br /> the Site is started , CONTRACTOR and OWNE all allocation of the Contract Price to component <br /> each deliver to the other, with copi o each parts of the Work. <br /> additional insured identified in t upplementary <br /> Conditions, certificates of urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> evidence of insuranc ich either of them or any AMENDING , REUSE <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are <br /> 3. 01 Intent <br /> A. The Contract Documents are comple- <br /> 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all . <br /> to run , but before any Wo a is started , a B. It is the intent of the Contract Documents <br /> to <br /> conference y ONTRACTOR , ENGINEER, describe a functionally complete Project (or part there- <br /> ar'r ers as appropriate will be held to establish a of) to be constructed in accordance with the <br />Contract <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\11314R Blvd Resurfacing 41st St to 53rd StSEE PROJ 0927Wdmim\Contract Documents\00700 - General Conditions REV 04 <br /> 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.