Laserfiche WebLink
SECTION 01340 <br /> SUBMITTALS <br /> PART 1 - GENERAL <br /> 1 . 01 DESCRIPTION OF REQUIREMENTS <br /> A . This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings , Product Data, Samples , Construction Photographs , and Construction or <br /> Submittal Schedules . Additional general submission requirements are contained in Article <br /> 6 . 17 of the General Conditions . Detailed submittal requirements are specified in the <br /> technical Sections . <br /> B . All submittals shall be clearly identified by reference to Section Number, Paragraph , <br /> Drawing Number or Detail as applicable . Submittals shall be clear and legible and of <br /> sufficient size for presentation of data . <br /> C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner ' s representatives . This log should <br /> include the following items : <br /> 1 . Submittal - Description and File number assigned . <br /> 2 . Date to Engineer . <br /> 3 . Date returned to Contractor from Engineer. <br /> 4 . Status of submittal (REVIEWED , NO COMMENTS ; REVIEWED COMMENTS <br /> AS NOTED ; REJECTED , REVISE AND RESUBMIT ; or NOT REVIEWED) . <br /> 5 . Date of resubmittal and return (as applicable) . <br /> 6 . Date material released for fabrication . <br /> 7 . Projected date of fabrication . <br /> 8 . Projected date of delivery to site . <br /> 9 . Status of O&M submittal . <br /> 1 . 02 SHOP DRAWINGS , PRODUCT DATA , SAMPLES <br /> A . Shop Drawings <br /> I . Shop drawings as specified in individual Sections include , custom - prepared data <br /> such as fabrication and erection/ installation (working) drawings , scheduled <br /> information , setting diagrams , actual shop work manufacturing instructions, <br /> custom templates , special wiring diagrams , coordination drawings , individual <br /> system or equipment inspection and test reports including performance curves and <br /> certifications , as applicable to the work . <br /> 2 . All shop drawings submitted by subcontractors shall be sent directly to the <br /> Contractor for checking . The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials . <br /> 3 . Check all subcontractors ' shop drawings regarding measurements , size of <br /> members , materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections . Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 01340- 1 <br />