My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-108B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-108B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:05:01 PM
Creation date
10/1/2015 2:41:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/10/2011
Control Number
2011-108B
Agenda Item Number
8.D.
Entity Name
Data Flow Systems,Inc.
Subject
Reuse Distribution Automation System upgrade and automation
Project Number
UCP-4065
Bid Number
2011032
Supplemental fields
SmeadsoftID
10005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br /> SUBMITTALS <br /> PART 1 - GENERAL <br /> 1 . 01 DESCRIPTION OF REQUIREMENTS <br /> A . This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings , Product Data, Samples , Construction Photographs , and Construction or <br /> Submittal Schedules . Additional general submission requirements are contained in Article <br /> 6 . 17 of the General Conditions . Detailed submittal requirements are specified in the <br /> technical Sections . <br /> B . All submittals shall be clearly identified by reference to Section Number, Paragraph , <br /> Drawing Number or Detail as applicable . Submittals shall be clear and legible and of <br /> sufficient size for presentation of data . <br /> C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner ' s representatives . This log should <br /> include the following items : <br /> 1 . Submittal - Description and File number assigned . <br /> 2 . Date to Engineer . <br /> 3 . Date returned to Contractor from Engineer. <br /> 4 . Status of submittal (REVIEWED , NO COMMENTS ; REVIEWED COMMENTS <br /> AS NOTED ; REJECTED , REVISE AND RESUBMIT ; or NOT REVIEWED) . <br /> 5 . Date of resubmittal and return (as applicable) . <br /> 6 . Date material released for fabrication . <br /> 7 . Projected date of fabrication . <br /> 8 . Projected date of delivery to site . <br /> 9 . Status of O&M submittal . <br /> 1 . 02 SHOP DRAWINGS , PRODUCT DATA , SAMPLES <br /> A . Shop Drawings <br /> I . Shop drawings as specified in individual Sections include , custom - prepared data <br /> such as fabrication and erection/ installation (working) drawings , scheduled <br /> information , setting diagrams , actual shop work manufacturing instructions, <br /> custom templates , special wiring diagrams , coordination drawings , individual <br /> system or equipment inspection and test reports including performance curves and <br /> certifications , as applicable to the work . <br /> 2 . All shop drawings submitted by subcontractors shall be sent directly to the <br /> Contractor for checking . The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials . <br /> 3 . Check all subcontractors ' shop drawings regarding measurements , size of <br /> members , materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections . Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 01340- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.